- BEMC
- BEMC Detector Operator Manual
- Calibrations
- BPRS
- BSMD
- BTOW - Calibration Procedure
- Run 12 BTOW Calibration
- Run 3 BTOW Calibration
- Run 4 BTOW Calibration
- Run 5 BTOW Calibration
- Run 6 BTOW Calibration
- Run 7 BTOW Calibration
- Run 8 BTOW Calibration (2008)
- Run 9 BTOW Calibration
- 01 BTOW HV Mapping
- 02 Comparing 2007, 2008 and 2009 BTOW Slopes
- 03 study of 2009 slopes (jan)
- 04 Spectra from Problem PMT Channels
- 05 Summary of HV Adjustment Procedure
- 06 comparison of BTOW status bits L2ped vs. L2W , pp 500 (jan)
- 07 BTOW status tables ver 1, uploaded to DB, pp 500
- 08 End or run status
- 09 MIP peaks calculated using L2W stream
- 10 Electron E/p from pp500 L2W events
- 11 BTOW crate gains based on L2W-ET triggered ADCs
- 12 Correcting Relative gains from 500 GeV L2W
- 13 Updating Calibration using the latest L2W production
- 14 200 GeV Calibration
- Database
- Hardware
- Mapping
- Service Tasks
- Software
- Useful Documents
- BTOF
- DAQ
- Detector Upgrades
- EEMC
- EPD
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
01 BTOW HV Mapping
Updated on Tue, 2009-03-17 17:45. Originally created by mattheww on 2009-03-06 17:17.
Under:
We started at the beginning of the run to verify the mapping between the HV cell Id and the softId it corresponds to. To begin, Stephen took 7 runs with all towers at 300V below nominal voltage except for softId % 7 == i, where i was different for each run. Here are the runs that were used:
softId%7 | Run Number | Events |
1 | 10062047 | 31k |
2 | 10062048 | 50k |
3 | 10062049 | 50k |
4 | 10062050 | 50k |
5 | 10062051 | 50k |
6 | 10062060 | 100k |
0 | 10062061 | 100k |
We used the attached file 2009_i0.txt (converted to csv) as the HV file. This file uses the voltages from 2008 and has swaps from 2007 applied. Swaps indentified were not applied and will be used to verify the map check.
File 2009_i0c.txt contains some swaps identified by the analysis of these runs.
File 2009_i1c.txt contains adjusted HV settings based on the electron/mip analysis with same mapping as 2009_i0c.txt.
Final 2009 BTOW HV set on March 14=day=73, Run 10073039 , HV file: 2009_i2d.csv
»
- Printer-friendly version
- Login or register to post comments