- BEMC
- BEMC Detector Operator Manual
- Calibrations
- BPRS
- BSMD
- BTOW - Calibration Procedure
- Run 12 BTOW Calibration
- Run 3 BTOW Calibration
- Run 4 BTOW Calibration
- Run 5 BTOW Calibration
- Run 6 BTOW Calibration
- Run 7 BTOW Calibration
- Run 8 BTOW Calibration (2008)
- Run 9 BTOW Calibration
- 01 BTOW HV Mapping
- 02 Comparing 2007, 2008 and 2009 BTOW Slopes
- 03 study of 2009 slopes (jan)
- 04 Spectra from Problem PMT Channels
- 05 Summary of HV Adjustment Procedure
- 06 comparison of BTOW status bits L2ped vs. L2W , pp 500 (jan)
- 07 BTOW status tables ver 1, uploaded to DB, pp 500
- 08 End or run status
- 09 MIP peaks calculated using L2W stream
- 10 Electron E/p from pp500 L2W events
- 12 Correcting Relative gains from 500 GeV L2W
- 13 Updating Calibration using the latest L2W production
- 14 200 GeV Calibration
- Database
- Hardware
- Mapping
- Service Tasks
- Software
- Useful Documents
- EEMC
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HLT
- L3
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
13 Updating Calibration using the latest L2W production
Updated on Sun, 2010-01-24 14:27. Originally created by mattheww on 2010-01-22 15:44.
Under:
I recalculated the Barrel calibration using the latest L2W production, which relies on the latest TPC calibration. It is suggested that this calibration be used to update the current calibration.
Fit Details:
Negative Peak location: 0.941
Negative Sigma: 0.14
Positive Peak location: 0.933
Positive Sigma: 0.17
<p> = 3.24 GeV
Fig 1. E/p for all electron (black), positive charged (blue), negative charged (red)
»
- Printer-friendly version