- BEMC
- BTOF
- DAQ
- Detector Upgrades
- EEMC
- 2007 run, hardware changes
- 2008 run preparation
- Calibrations
- EEMC Detector Operator Manual
- EEMC Maintenance/Operations Documents
- Endcap Geometry
- Endcap Geometry update (2009)
- Log of tower base and fee issues
- eemc as-built info and proto tests
- emc2-hn minutes (by Jan)
- how-to by Jan
- slow controls archive viewer
- trash
- EPD
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
Timing Scan 11/29/2007
Updated on Mon, 2007-12-03 11:56. Originally created by jwebb on 2007-11-30 15:41.
Under:
Email from Will setting tower timing for this year
Timing Scan 11/29/2007
posted 11/30/2007 Shiftlog entryrun btow etow
8333113 12 5
115 17 15
116 22 25
117 27 35
118 32 45
120 37 55
121 42 65
123 52 70
124 57 60
125 62 50
126 36 40
127 36 30
128 36 20
129 36 10
Figure 1 -- Tower crates
Email from Will setting tower timing for this year
Below in the forwarded message you will see a link to the analysis (thanks Jason) of the more recent (much better statistics) EEMC tower timing scan. Based on these I set the timing for this year as follows (from my shift log entry) ************* > 11/30/07 > 19:49 > > General > new timing configuration files loaded for EEMC towers > crate 1 delay 0x12 (no change from last year nominal) > crate 2 delay 0x8 (no change) > crate 3 delay 0x57 ( + 1 ns) > crate 4 delay 0x52 (+ 2 ns) > crate 5 delay 0x2b (no change) > crate 6 delay 0x1f (no change) > change ETOW phase to 21 (saved in all configs) > above phase represents overall shift of + 2 ns
»
- Printer-friendly version
- Login or register to post comments