- BEMC
- BTOF
- DAQ
- Detector Upgrades
- EEMC
- EPD
- 2017 cosmic ray tests at OSU and BNL
- Calibrations
- EPD Meetings
- EPD Slow-Control Manual
- EPD-GSTAR
- IV Scan
- Individual's pages
- Known issues and problems
- Mapping
- Offline DataBase
- Operations 2017
- Operations 2018
- Operations 2019
- Operations 2024
- Software
- Start-of-run EPD tasks and instructions
- Useful EPD documents
- Useful Links
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
Operations 2024
Updated on Mon, 2024-10-07 13:36 by mstefaniak. Originally created by lisa on 2024-04-15 17:27.
Under:
Pre-beam commissioning
With-beam commissioning
Transition to Au+Au running - Oct 2024:
Issues for this run
Pre-beam commissioning
- Installation and light-tight test of the EPD April 2024 - blog by Rosi
- Seven Patterns mapping test - done by Maria
- Vped scan - done by Maria and Mike 16 April 2024 - blog by Mike
- FEE temperatures as a function of position in the box - correlated to dark current? - blog by Mike
- Visual map of mapping - includes instructions for shift crew
With-beam commissioning
- Timing scan- done by Maria and Mike 27 April 2024 - blog by Mike
- Bias scan- done by Maria and Mike 27-28 April 2024 - blog by Mike
- TAC offset adjustment - done by Mike 28-29 April 2024 - blog by Mike
Transition to Au+Au running - Oct 2024:
- Quick-and-dirty timing scan - done by Maria and Mike 6 Oct 2024 - blog by Mike
- TAC offset adjustment - done by Mike 7 Oct 2024 - blog by Mike
Issues for this run
»
- Printer-friendly version