- BEMC
- BTOF
- DAQ
- Detector Upgrades
- EEMC
- EPD
- 2017 cosmic ray tests at OSU and BNL
- Calibrations
- EPD Meetings
- EPD Slow-Control Manual
- EPD-GSTAR
- IV Scan
- Individual's pages
- Known issues and problems
- Mapping
- Offline DataBase
- Operations 2017
- Operations 2018
- Operations 2019
- Operations 2024
- Software
- Start-of-run EPD tasks and instructions
- Useful EPD documents
- Useful Links
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
Start-of-run EPD tasks and instructions
Updated on Thu, 2020-06-11 18:41. Originally created by adams92 on 2019-12-17 22:16.
Under:
At the beginning of every run, there are a number of things that need to be done for the EPD.
After the EPD is installed, and before beam, you need to:
After the EPD is installed, and before beam, you need to:
- Check mapping from "TUFF space" to "StEvent space"
- Check connector orientations
- Check that you're in the right pre-post
- Compare dark currents to before the shut down
- Re-confirm pre-post (same as above)
- Do timing scan (this needs to be done for physics to be declared!)
- My instructions (note: you need to prepare for this in advance!)
- Do bias voltage scan (this can be done after physics is declared)
»
- Printer-friendly version
- Login or register to post comments