Detector Configuration, cost and schedule
Updated on Sat, 2015-01-31 11:16. Originally created by xzb on 2015-01-28 10:07.
Under:
FCS proposal cost and technical driven schedule. https://drupal.star.bnl.gov/STAR/system/files/FCS_proposal_v2.docx
»
- Printer-friendly version
- Login or register to post comments