STAR RD and upgrades for 2014
Three upgrades are being prepared for run-15. namely a peshower, refurbishing of FMS, and the RP-II*
- Preshower proposal (word)
- FMS upgrade plan document
- Upgrade status as of Feb 13 (powerpoint)
In addition STAR made a call for R&D with deadline on December 15. The documents received are:
- iTPC electronics by Tonko document
- Reaction Plane Detector by Alex Schmah document
- Forward Tracking R&R document
- eTOF proposal document
- Upgrade for TDC in QT cards document
The talks at the February 10, review can be found athttps://drupal.star.bnl.gov/STAR/event/2014/02/10/star-rd-2014-and-itpc-review
on the STAR event page.
Groups:
- Printer-friendly version
- Login or register to post comments