- BEMC
- EEMC
- 2007 run, hardware changes
- 2008 run preparation
- Calibrations
- 2007 EEMC Tower Gains
- Calculating EEMC pedestal and status tables
- Calculating EEMC tower ideal gains and expected MIP response
- EEMC Calibration Docs
- EEMC Tower Swaps
- Overview for generating EEMC pedestals and status tables
- Producing ADC distributions for the EMCs from raw DAQ files
- Run 10 EEMC Calibrations
- Run 11 EEMC Calibrations
- Run 12 EEMC Calibrations
- Run 13 EEMC Calibrations
- Run 15 EEMC Calibrations
- Run 17 EEMC Calibrations
- Run 8 EEMC calibrations
- Run 9 EEMC calibrations
- Uploading EEMC Pedestal, Status and Gain Calibrations to the DB
- EEMC Maintenance/Operations Documents
- Endcap Geometry
- Endcap Geometry update (2009)
- Log of tower base and fee issues
- eemc as-built info and proto tests
- emc2-hn minutes (by Jan)
- how-to by Jan
- slow controls archive viewer
- trash
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HLT
- L3
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
pp500 EEMC Gain Calibration with MIPs
Updated on Tue, 2016-11-08 13:36. Originally created by jhkwas on 2016-11-08 13:36.
Under:
Note four sets of tower gains were uploaded to the database to account for gain decrease over the course of the run.
See attachments for calibration summary and masks lists.
Plots can be found here:
http://www.star.bnl.gov/protected/spin/jhkwas/calibrations/run12plots/
»
- Printer-friendly version
- Login or register to post comments