- BEMC
- BTOF
- DAQ
- Detector Upgrades
- EEMC
- EPD
- 2017 cosmic ray tests at OSU and BNL
- Calibrations
- EPD Meetings
- EPD Slow-Control Manual
- EPD-GSTAR
- IV Scan
- Individual's pages
- Known issues and problems
- Mapping
- Offline DataBase
- Operations 2017
- Operations 2018
- Operations 2019
- Operations 2024
- Software
- Start-of-run EPD tasks and instructions
- Useful EPD documents
- Useful Links
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
EPD-GSTAR
Updated on Thu, 2017-12-07 11:28. Originally created by sprastar on 2017-07-17 12:37.
Under:
1st iteration by Sam:
2nd iteration by Prashanth:
Added tile structure:
Dropbox link for log book:
https://www.dropbox.com/s/73ddkbhnmvpnpc1/vsp_gstar_071717.pdf?dl=0
3rd Iteration by Prashanth
Changes:
1. Tile coordinates are from Solid Works.
2. Implemented thinner part of the tiles.
3. More realistic tile 1
Blue are regular 1.2 cm thick tiles.
Green are thinner part of tiles.
Red Tile 1 lower side (Trapezoidal)
Magenta Tile 1 triangular part.
Here is the detail calculations:
https://drupal.star.bnl.gov/STAR/system/files/SuperSectorCorners.xlsx
»
- Printer-friendly version
- Login or register to post comments