- BEMC
- BTOF
- DAQ
- Detector Upgrades
- EEMC
- EPD
- 2017 cosmic ray tests at OSU and BNL
- Calibrations
- EPD Meetings
- EPD Slow-Control Manual
- EPD-GSTAR
- IV Scan
- Individual's pages
- Known issues and problems
- Mapping
- Offline DataBase
- Operations 2017
- Operations 2018
- Operations 2019
- Operations 2024
- Software
- Start-of-run EPD tasks and instructions
- Useful EPD documents
- Useful Links
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
Mapping
Updated on Wed, 2023-05-31 12:23 by protzt. Originally created by lisa on 2017-02-04 16:02.
Under:
Here we keep pages (they are "child pages" to this one) relating to mapping. This includes hardware maps of detector components to electronics and sofware maps of tiles to physical location.
The current mapping is: https://drupal.star.bnl.gov/STAR/system/files/EPD_mapping_4crate_05312023.xlsx
Old files below.
Here we keep pages (they are "child pages" to this one) relating to mapping. This includes hardware maps of detector components to electronics and sofware maps of tiles to physical location.
The current mapping is: https://drupal.star.bnl.gov/STAR/system/files/EPD_mapping_4crate_05312023.xlsx
Old files below.
»
- Printer-friendly version
- Login or register to post comments