- BEMC
- BTOF
- DAQ
- Detector Upgrades
- EEMC
- EPD
- 2017 cosmic ray tests at OSU and BNL
- Calibrations
- EPD Meetings
- EPD Slow-Control Manual
- EPD-GSTAR
- IV Scan
- Individual's pages
- Known issues and problems
- Mapping
- Offline DataBase
- Operations 2017
- Operations 2018
- Operations 2019
- Operations 2024
- Software
- Start-of-run EPD tasks and instructions
- Useful EPD documents
- Useful Links
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
EPD Meetings
Updated on Wed, 2021-10-27 22:02 by rjreed. Originally created by sprastar on 2017-02-17 11:18.
Under:
EPD Meetings
Thursdays 08:30 (BNL time)
Meeting Zoom
https://lehigh.zoom.us/j/93334661391?pwd=b1hpY3lPK3hPM0tCM2d0YUZOYk96UT09
Meeting 27 October 2021 (830 am EST)
Meeting 1 July 2021 (830 am EST)
Meeting 3 June 2021 (830 am EST)
Meeting 13 May 2021 (830 am EST)
Meeting 6 May 2021 (830 am EST)
Meeting 11 March 2021 (830 am EST)
Meeting 19 June 2017
Rosi: drupal.star.bnl.gov/STAR/system/files/RReedEPD06192017.pdf
More complete analysis, including PDFs of all 93 channels and their associated ADC, TDC and TAC values can be found at: drupal.star.bnl.gov/STAR/blog/rjreed/auau-54-gev-triggers-and-eval-part-1
For those who may be interested in vertexing, multiplicity in the 54 GeV data, look at (not to be discussed): drupal.star.bnl.gov/STAR/blog/rjreed/auau-53-gev-evaluating-performance
Mike: In Au+Au collisions at 54 GeV (much higher than the multiplicities that drove the design of the EPD), we expect very significant multi-hit events on the tiles. In fact, this analysis based on central Au+Au collisions at 62.4 GeV published by PHOBOS, indicated that the average hit multiplicity on a tile would be greater than 1.
And indeed, this is what we see, as shown on the following page:
drupal.star.bnl.gov/STAR/blog/lisa/multi-mip-events-2017-epd-auau-54-gev
Most particles are not coming from single-hit events. So, we will need to be careful not to show "real quick dN/deta distributions," as they will be way off.
Justin:
Fiber polishing and bundle creation at Lehigh
drupal.star.bnl.gov/STAR/system/files/Fibers%2C%20EPD%20Meeting%206-19-17.pdf
drupal.star.bnl.gov/STAR/system/files/SS%25231_Fibers%281%29.pdf
Sam:
Simulation update
drupal.star.bnl.gov/STAR/system/files/sim_EPD_update06192017.pdf
Meeting 5 June 2017
1) Mike: TDCvsTAC
It turns out that all QT channels have a TDC in addition to the ADC they put out. Supposedly it is a 5-bit TDC, but Hank reports that he's only seen 4 bits fire (returned value 0..15). I have verified this in the EPD QTB boards, and find that the TDC is linearly proportional to the TAC, in the one QTB board that has a TAC. You may find the picture here:
drupal.star.bnl.gov/STAR/system/files/TDCvsTAC.png
This could be useful in data analysis, for ALL channels (even the QT32Bs that will not have TAC, which is 75% of the EPD channels in 2018+). I expect (though it has not been tested) that we can require TDC not equal zero, and be looking at in-time hits..
The TDC information is now included in the StEpdTile data object.
The following plots are ADC distributions, where the blue curves correspond to TDC!=0 and the red curves are for TDC=0.
drupal.star.bnl.gov/STAR/system/files/ValidTDCstudy.pdf
The TDC would seem to be an excellent way to discriminate noise/out-of-time signals from real particles. Much more convenient than an ADC threshold..... Except for a couple of bins, where the behaviour is precisely opposite to that expected. This needs to be investigated.
More detail: drupal.star.bnl.gov/STAR/system/files/TDCstudy.pdf
2) Polishing at Lehigh:
drupal.star.bnl.gov/STAR/system/files/FiberPolishing06052017.pdf
drupal.star.bnl.gov/STAR/system/files/FiberPolishing06052017_pics.pdf
Meeting on 5/22/2017
1) Prashanth: Short update/summary of the situation with the QTs and new FEEs
www.star.bnl.gov/protected/bulkcorr/prashanth/EPD/weeklymeetings/PrashanthS_05222017.pdf
www.star.bnl.gov/protected/bulkcorr/prashanth/EPD/weeklymeetings/PrashanthS_05222017.pdf
Meeting on 5/16/2017 - at BNL during STAR Collaboration Meeting
Tuesday evening at 6:30 with pizza
Current run
Meeting on 5/08/2017
1) Rosi - BBC-EPD correlations: drupal.star.bnl.gov/STAR/system/files/RReedEPDBBCCorr05092017.pdf
BBC - EPD timing studies: drupal.star.bnl.gov/STAR/blog/rjreed/epd-timing-correletion-slew-correction-vs-bbc-ii
Trigger, etc.
2) Justin - Fiber polishing and testing at Lehigh:
On the hardware page under "Useful EPD Documents": drupal.star.bnl.gov/STAR/system/files/Justin%20Polishing%20Testing.pdf
Also at: http://www.star.bnl.gov/protected/bulkcorr/prashanth/EPD/Polishing_Testing_Justin_05082017.pdf
Meeting on 5/01/2017
1) Rosi - EPD-BBC timing studies & QT32C spikes - drupal.star.bnl.gov/STAR/blog/rjreed/epd-timing-correletion-slew-correction-vs-bbc
2) Prashanth - status at STAR
Also, discriminator study: drupal.star.bnl.gov/STAR/subsys/epd/operations-2017/discriminator-threshold-scan
3) Rosi - status of trigger coordination, including trigger bit test, etc.
4) Gerard - status/plans for FEE upgrade drupal.star.bnl.gov/STAR/system/files/gain_change_update.pdf
5) Mike - status/plans of EPD construction at OSU
6) Mike - ADC spectra with TAC cut - drupal.star.bnl.gov/STAR/system/files/ADCfitsTACcut_Lisa28apr2017.pdf
7) All - availability for in-person EPD session at STAR Collaboration Meeting
8) All - Plans for the coming week
Meeting on 4/24/2017
1) Rosi's blog:
drupal.star.bnl.gov/STAR/blog/rjreed/epd-analysis-32b-vs-32c-timing-correlations-etc
www.dropbox.com/s/rbgzbbuhqfev1kr/BBCEPDCorr.pdf
3) Mike timing
www.dropbox.com/s/bn5wpxxj8gmm2qv/Timing.pdf
EPD To-Dos:
1) Confirm 32C settings - Change Tier 1 file!
2) Threshold Scan (32B first, then 32C once the above is accomplished)
3) DSM Bit checking
4) Software in CVS?
Meeting on 4/17/2017
1) Prashanth (software)
Mike's StEpd analysis software: /star/u/lisa/StEpd/
Database related
https://drupal.star.bnl.gov/STAR/blog/sprastar/epd-offline-db-table
https://online.star.bnl.gov/dbExplorer/
Meeting on 4/10/2017
1) Status of QT32Cs - Prashanth, Rosi, Gerard, Hank(?)
2) Bias scan - Mike
drupal.star.bnl.gov/STAR/subsys/epd/operations-2017/bias-scan
Meeting on 4/03/2017
0) Status - Prashanth, all
1) Prepost 32c vs 32b
2) Gate scan + conclusions
drupal.star.bnl.gov/STAR/system/files/GateScan_1.pdf
Summary:
4) Bias Scan - Rosi has produced files for analysis; Mike has not yet analyzed them.
5) Gerard, all: interpretation of QT32C messages
6) Dark current:
7) Rosi - IV scan histograms: drupal.star.bnl.gov/STAR/system/files/IvscanHistos_03_26_2017.pdf
7.5) Sam - First steps with GEANT4 EPD: drupal.star.bnl.gov/STAR/system/files/EPD_geantSTARSIM_0.pdf
8) (If time) - Rosi: First steps with UrQMD: drupal.star.bnl.gov/STAR/system/files/RReedEPD03272017.pdf
8.5) Rosi: Starting to look at BES data (7.7 GeV): drupal.star.bnl.gov/STAR/system/files/RReedEPD04032017.pdf
9) Tasks for the coming week.
Meeting on 3/27/2017
1) Prashanth, all:
2) Mike - Gate scan study
3) All: Next steps for this week
4) Dark current:
5) Rosi - IV scan histograms: drupal.star.bnl.gov/STAR/system/files/IvscanHistos_03_26_2017.pdf
6) Joey - BBC-EPD correlations - drupal.star.bnl.gov/STAR/system/files/EPD%20Presentation.pdf
7) (If time) - Rosi: First steps with UrQMD: drupal.star.bnl.gov/STAR/system/files/RReedEPD03272017.pdf
Meeting on 3/20/2017
1) Mike: PrePost study of runs 1806643, 18076064 and 18076065:
drupal.star.bnl.gov/STAR/system/files/Study18066043and18076064and18076065all.pdf
(This study under the Operations 2017 child page)
2) Mike: Draft (v1) of trigger documents shared with trigger group and to be discussed 21march2017:
drupal.star.bnl.gov/STAR/system/files/EPD%20Trigger%20Requirements%20v1.pdf
3) Mike: First Gate Scan study. This will need to be revised, as discussed on first page of this document.
drupal.star.bnl.gov/STAR/system/files/GateScan_PrePostIndex2.pdf
(This study under the Operations 2017 child page)
Meeting on 3/13/2017
1) Mike: TAC-selected spectra from run 18067001: drupal.star.bnl.gov/STAR/system/files/Run18067001_spectra.pdf
Also, drupal.star.bnl.gov/STAR/system/files/FitValidTACadcSpectrum.pdf
Meeting on 3/6/2017
1) Mike: Spectra Fits from vbias 56.5V data: drupal.star.bnl.gov/STAR/system/files/MLisaEPDFits03062017.pdf
2) Rosi: Vbias comparison: drupal.star.bnl.gov/STAR/system/files/h_CompareVolt03052017_Vbias56_5_v3.pdf
How shall we set these values? (Above needs to be repeated with the better vped values and with Jack's new Tier1 file.)
Meeting on 2/27/2017
1) Rosi - Tested the detector by increasing the Vbias in each channel by 5 V. The dark current increased, one can see it at:
drupal.star.bnl.gov/STAR/system/files/h_DarkCurrentHistogram_Nhours149.pdf
The current increase is at the end.
Plot of the pedestal per channel:
https://drupal.star.bnl.gov/ STAR/system/files/h_ Ped18052002_v2.pdf
Only one channel is "fat" and it should be determined whether it is FEE, QT, or Receiver
Dark Current as of this morning:
drupal.star.bnl.gov/STAR/system/files/h_DarkCurrent_Nhours288.pdf
Gerard asked what happens if we decrease ymax to 0.3nA, see:
drupal.star.bnl.gov/STAR/system/files/h_DarkCurrent_Nhours288_ymax03.pdf
Lehigh schedule for WSL fibers:
drupal.star.bnl.gov/STAR/system/files/epd_schedule_Lehigh_WSL.pdf
Also note, Prashanth has added it to the online monitoring!
2) Prashanth - Timing in, inclusion to StRoot
3) Sam - Adding EPD to the STAR GEANT:
drupal.star.bnl.gov/STAR/system/files/Epd_Geant.pdf
Meeting on 2/20/2017
1) Rosi -
VPed Setting: Code is at /gpfs01/star/subsysg/EPD/VpedDet/
Summary: drupal.star.bnl.gov/STAR/system/files/RReed_EPD_02192017_Vped.pdf
1 set of fits: drupal.star.bnl.gov/STAR/system/files/h_Vped.pdf
Vbias: Code is at /gpfs01/star/subsysg/EPD/IVScan
Summary: drupal.star.bnl.gov/STAR/system/files/RReed_EPD_IVscan_02192017.pdf
Dark Current: Code is at /gpfs01/star/subsysg/EPD/ DarkCurrentMonitor
Summary: drupal.star.bnl.gov/STAR/system/files/RReed_EPD_IVscan_02192017.pdf
Scan at of 10:30 am: drupal.star.bnl.gov/STAR/system/files/h_DarkCurrentHistogram_EPD02202017.pdf
Note: I did an IV scan, which we can see the evidence of. Also, I am unsure why one of the boards is not showing any movement. I will check on this during the week.
Open questions: When can we be timed in? Shift crew instructions? Monitoring at: https://online.star.bnl.gov/epd/ ? MuDst?
2) Prashanth -
online monitoring page here: https://online.star.bnl.gov/ epd/
Notes: Prashanth is discussing with Akio the best way to incorporate our detector in the MuDsts. The question is where does the mapping get picked up, which is currently being picked up in the trigger data.
Action items for Rosi:
*Test the detector by setting Vbias = Vbias + 5 V to see that the dark current has increased.
*Plot the pedestal distributions per channel.
*Touch base with Akio/Tonko about the functionality of the standby mode and whether it is needed for pedstal runs.
*Fix Vped for 3 channels not connected to an EPD tile
*Touch base with Prashanth to see what software tasks can be distributed so he can concentrate on incorporating the EPD into the MuDst
*Ask to have the IV Scan + Pedestals taken via the shift crew (pending the answer from Akio/Tonko).
We also discussed the need for documentation, at the moment things are a bit chaotic. This will improve our ability to distribute tasks.
Old BlueJeans connection info.
EPD Meetings
Thursdays 08:30 (BNL time)
Meeting Zoom
https://lehigh.zoom.us/j/93334661391?pwd=b1hpY3lPK3hPM0tCM2d0YUZOYk96UT09
Meeting 27 October 2021 (830 am EST)
- Run 22 EPD install
- Operations Run 22
- Calibration progress
- 19.6 GeV production issues?
-
AOB
- EPD Small Systems - Jordan Cory - drupal.star.bnl.gov/STAR/system/files/Cory%20EPD%20Meeting%208-12.pdf
- Calibrations
- AOB
Meeting 1 July 2021 (830 am EST)
- EPD Removal Plan
- Calibrations
- AOB
Meeting 3 June 2021 (830 am EST)
- EPD Current Status
- Calibrations
- AOB
Meeting 13 May 2021 (830 am EST)
- EPD EQ3 Issues and OO Running - drupal.star.bnl.gov/STAR/system/files/RReedEPD05132021.pdf
- EPD EP Resolution
- Calibrations
- AOB
Meeting 6 May 2021 (830 am EST)
- dN/dphi - Xiaoyu - drupal.star.bnl.gov/STAR/system/files/EPD05062021.pdf
- Run 21 Calibrations
- Run 21 OO Running
- AOB
Meeting 11 March 2021 (830 am EST)
- Beamline Offset - Xiaoyu
- Run 21 -
- AOB
Meeting 4 March 2021 (830 am EST)
Meeting 24 FEB 2021 (830 am EST)
Meeting 11 FEB 2021 (830 am EST)
Meeting 14 Jan 2021 (830 am EST)
Meeting 3 Dec 2020 (830 am EST)
Meeting 12 Nov 2020 (830 am EST)
Meeting 1 Oct 2020 (830 am EST)
Meeting 30 July 2020 (830 am EST)
Meeting 25 June 2020 (830 am EST)
Meeting 11 June 2020 (830 am EST)
Meeting 21 May 2020 (830 am EST)
Meeting 8 May 2020 (830 am EST)
Meeting 24 April 2020 (830 am EST)
Meeting 17 April 2020 (830 am EST)
Meeting 10 April 2020 (830 am EST)
Meeting 3 April 2020 (830 am EST)
Meeting 3 April 2020 (830 am EST)
Meeting 20 March 2020 (830 am BNL time)
Meeting 20 March 2020 (830 am EST)
Meeting 19 April 2019
Meeting 15 March 2019
Meeting 22 February 2019
Meeting 8 February 2019
Meeting 12 November 2018
Meeting 15 October 2018
Meeting 13 August 2018
Meeting 6 August 2018
Meeting 30 July 2018
Meeting 2 July 2018
Meeting 25 June 2018
Meeting 4 June 2018
Meeting 28 May 2018
First half
Meeting 23 May 2018
First half
Meeting 7 May 2018
First half
Meeting 23 April 2018
First half
Meeting 16 April 2018
First half
Meeting 9 April 2018
First half
Meeting 2 April 2018
First half
Meeting 19 March 2018
First half
Meeting 12 March 2018
First half
First half
First half
Meeting 19 February 2018
First half
Meeting 12 February 2018
First half
Meeting 5 February 2018
First half
Meeting 29 January 2018
First half
Meeting 15 January 2018
First half
Meeting 8 January 2018
First half
Meeting 18 December 2017
First half
Meeting 4 December 2017
First half
Meeting 20 November 2017
First half
Meeting 13 November 2017
First half
Meeting 23 October 2017
First half
Second half
Meeting 16 October 2017
First half
Meeting 09 October 2017
First half
Meeting 02 October 2017
First half
Meeting 25 September 2017
First half
Meeting 18 September 2017
First half
Meeting 11 September 2017
First half
11 September 2017 - Labor day in U.S. - Meeting cancelled
Meeting 28 August 2017
First half
First half
Meeting 14 August 2017
First half
Meeting 31 July 2017
Meeting 24 July 2017
Meeting 17 July 2017
Meeting 10 July 2017
2nd half of meeting:
Meeting 3 July 2017
Hanseul: dN/deta toy model: drupal.star.bnl.gov/STAR/system/files/3Jul17_EPD_dNdeta.pdf
Meeting 26 June 2017
Mike: How to extract pseudorapidity distributions from high-multiplicity data.
(We do not have to discuss this in excruciating detail...)
drupal.star.bnl.gov/STAR/blog/lisa/measuring-pseudorapidity-distribution-epd
Rosi: Questions -> Where are we going to store the quarter wheel? How is the EPD being transported to BNL? EPD storage cart?
George Halal: Initial studies of offline EPD trigger
drupal.star.bnl.gov/STAR/system/files/EPD%20Meeting6-26-17George%20Halal.pdf
- Simulation - Mate
- Run 21 -
- AOB
Meeting 24 FEB 2021 (830 am EST)
- Run 21 issues
- Calibrations
- Beamline offsets, etc
- AOB
Meeting 11 FEB 2021 (830 am EST)
- Calibrations
- Beamline offsets, etc
- Run 21
- Simulations
- AOB
Meeting 14 Jan 2021 (830 am EST)
- FCS Splitter? (5 ns vs 2 ns?)
- Calibrations
- Run 21 - drupal.star.bnl.gov/STAR/blog/rjreed/epd-install-calibration-and-commissioning-run-21
- Calibrations - www.star.bnl.gov/~mcsanad/epd/dNdEta_summary_2021jan14.pdf
- AOB
Meeting 3 Dec 2020 (830 am EST)
- Calibrations
- Run 21
- To-dos - Bad channels/boards? Calibrations during Run?
- AOB
Meeting 12 Nov 2020 (830 am EST)
- Calibrations
- Centrality at 7.7 GeV
- Run 21
- Signals to FCS DEP -> Which FEE?
- AOB
Meeting 1 Oct 2020 (830 am EST)
- EPD removal
- Calibrations
- Run 21
- AOB
- Calibrations
- Conclusion of Run 20
- Run 21
- Rosi - Some 7.7 GeV fun drupal.star.bnl.gov/STAR/system/files/RReed09172020.pdf
Meeting 30 July 2020 (830 am EST)
- Mate - Extracting dNch/deta - drupal.star.bnl.gov/STAR/blog/mcsanad/extracting-dnchdeta-epd-data
- Skipper - calibration status
Meeting 25 June 2020 (830 am EST)
- Rosi - Pedestal and Vped issues - drupal.star.bnl.gov/STAR/blog/rjreed/epd-pedestal-issue-access
- Ding - v1 at 7.2 GeV FXT - drupal.star.bnl.gov/STAR/system/files/psi_1_EPD_and_v1_eta_in_FXT_Au_Au_collision_7.2%20GeV.pdf
- Cameron - 9.2 GeV calibration issues - drupal.star.bnl.gov/STAR/system/files/CameronRacz_CalibIssues.pdf
- Skipper 14.5 GeV calibration - drupal.star.bnl.gov/STAR/system/files/EPD_14p5_Calibration_06_24_2020.pdf
Meeting 11 June 2020 (830 am EST)
- EPD LV power supply turn on procedure: https://drupal.star.bnl.gov/STAR/system/files/EPD_Turn_ON_PS.pdf
Meeting 28 May 2020 (830 am EST)
Meeting 21 May 2020 (830 am EST)
- Mate/Roland – simulation and unfolding status
- Skipper/Ding – calibration summary - drupal.star.bnl.gov/STAR/system/files/Kagamaster_EPD_14p5_Calibration_05_21_2020.pdf
- Xiaoyu – extracting v1 from nMIP distributions
- Prashanth/Akio - EPD mapping simulation - www.star.bnl.gov/protected/spin/akio/fcs/epd/
- AOB
Meeting 8 May 2020 (830 am EST)
- Skipper - Centrality measures in the BES with the EPD
- Roland/Mate - simulation/unfolding status
- Skipper/Ding - calibration
Meeting 24 April 2020 (830 am EST)
- Roland/Mate - rolandpinter.web.elte.hu/EPD%20meeting/EPDmeeting_2020apr24.pptx
- Skipper/Xiaoyu/Ding - calibration status/documentation
- Mike dN/deta - drupal.star.bnl.gov/STAR/system/files/EpdMeeting24April2020_0.pdf
Meeting 17 April 2020 (830 am EST)
- Roland/Mate – simulation- drupal.star.bnl.gov/STAR/system/files/EPDmeeting_2020apr17_0.pdf
- Skipper/Ding – calibration/database:
- Joey – Y-repair -
- Xiaoyu - QA
Meeting 10 April 2020 (830 am EST)
- Potential RHIC re-start 2020 – Rosi & Mike
- Simulation status – Roland
- Calibration – Skipper & Ding (if any report)
- Repair of the Y-piece – Joey
- dN/deta status (if time) – Mike
Meeting 3 April 2020 (830 am EST)
- Simulation Status - Roland, Mate
- Calibrations and database - Skipper and team
- fixing Y splitters (anything left to discuss?) - Joey
Meeting 3 April 2020 (830 am EST)
- Fixing Y-splitters - All -
- Simulation Status - Roland -
- Calibration - Ding - drupal.star.bnl.gov/STAR/system/files/dchen_EPD_7p7_calibration.pdf
- Calibration - Skipper - drupal.star.bnl.gov/STAR/system/files/Kagamaster_EPD_14p5_Calibration%20Issues.pdf
- Fast Simulator - Mike
Meeting 20 March 2020 (830 am BNL time)
- Simulation status - Roland
- Calibration status - Skipper and Ding
- Repair of Y - Joey
- Potential RHIC restart - all
- dN/deta status (if time) - Mike
Meeting 20 March 2020 (830 am EST)
- Simulation Status - Roland - drupal.star.bnl.gov/STAR/system/files/epdmeeting_2020_03_20.pdf
- Calibration - Skipper - https://drupal.star.bnl.gov/STAR/system/files/Kagamaster_EPD_14p5_Calibration%20%281%29.pdf
- Fast Simulator - Mike - drupal.star.bnl.gov/STAR/blog/lisa/epd-meeting-20-march-2020-epd-fast-simulator
Meeting 19 April 2019
- QT32B algorithms - what to expect, based on bench tests
- effect of QT32B algorithms running now in STAR - Skipper
- Calibration status (including FXT) - Skipper - https://drupal.star.bnl.gov/ST
AR/system/files/Kagamaster_EPD Meeting_04192019.pdf - Simulations status - Roland, Prashanth
- EPD paper - www.overleaf.com/17484095yjvtdpwmnzbp
- Skipper - 2018 gain calibrations
- Cat -EPD-BBC correlations - https://drupal.star.bnl.gov/ST
AR/system/files/EpdBbcCorrel_ AntiCorrel_2.pdf - Rosi & Joey - run status
Meeting 15 March 2019
- Roland - EPD simulation, status, questions - https://www.star.bnl.gov/~rolandp/EPD_SIMULATION/EPDSimStatQuestions.pdf
- Skipper - 2018 gain calibrations
- Cat -EPD-BBC correlations
- Rosi & Joey - run status
Meeting 22 February 2019
- Cat - EPD-BBC correlations
- Skipper - 2018 gain calibrations
- All - commissioning with beam
- Run 20 EPD Tasks still to go
Meeting 8 February 2019
- Skipper Calibrations - drupal.star.bnl.gov/STAR/system/files/EPD_02_08_2019_Kagamaster.pdf
- Preparations 2019 - drupal.star.bnl.gov/STAR/subsys/epd/operations-2019/post-installati on-pre-beam-commissioning-2019
- Is 3:30 on Mondays still okay?
- Calibrations and database - what is done, what is not? - Skipper, Prashanth
- Upcoming EPD activities
- Thurs, 24 Jan
- Install TUFF & PS - Mike (unless Tim has already done so)
- Install FEEs on SW FEE box - Mike, Joey, Xiaoyu
- Ready a staging area - Lehigh crew
- Friday, 25 Jan
- Mount EPD (& BBC?) - team
- dark current / light-tight
- Saturday 26 Jan
- let us discuss today
- 28 January - 1 February - Joey (& Justin?)
- ....
- Thurs, 24 Jan
- What do we need to be doing now, before arriving at BNL?
- Commissioning documentation - (click here to see 2018 documentation)
- Do we need to add slewing?
- EPD Users Guide and shift crew instruction - Justin & Joey - current documentation here
- There is a note at the bottom regarding "1-wire scan" that the EPD crew is looking into something....?
- EPD GUI readiness for this weekend
Meeting 12 November 2018
- Rosi- Triggering with the EPD - drupal.star.bnl.gov/STAR/system/files/RReedEPD11122018.pdf
- Backup Information: Blog - drupal.star.bnl.gov/STAR/blog/rjreed/analysis-27-gev-data-triggering-correct-version and Isobar Resolution Study: drupal.star.bnl.gov/STAR/blog/rjreed/epd-vertex-resolution and BES presentation: drupal.star.bnl.gov/STAR/system/files/RReedBES10302018.pdf
- Start of slew correction write-up: drupal.star.bnl.gov/STAR/blog/rjreed/slew-corrections-epd
Meeting 15 October 2018
- George - Machine Learning and the EPD - drupal.star.bnl.gov/STAR/system/files/GeorgeHalal101518EPDMeeting.pdf
- George - Machine Learning and the EPD - drupal.star.bnl.gov/STAR/system/files/GeorgeHalal100118EPDMeeting.pdf
Meeting 13 August 2018
- Skipper - Calibration for isobars - Completed
- Joey - Twisting effect of B-field drupal.star.bnl.gov/STAR/blog/adams92/twisting-effect-b-field-star
Meeting 6 August 2018
- Skipper - Calibration for isobars and AuAu drupal.star.bnl.gov/STAR/system/files/EPD_Meeting_Kagamaster_8_6_2018.pdf
- Prashanth - progress and status of simulation STAR/system/files/userfiles/3254/GSTAR08062018.pdf
- Joey - twisting effect of B-field. drupal.star.bnl.gov/STAR/blog/adams92/twisting-effect-b-field-star
- For reference: Xinyue's simulation-based study from summer 2017: drupal.star.bnl.gov/STAR/subsys/epd/individuals-pages/xinyue-ju
Meeting 30 July 2018
- Skipper - Calibration status: drupal.star.bnl.gov/STAR/system/files/Kagamaster_7_30_2018.pdf
Meeting 2 July 2018
- Rosi - STAR Collaboration meeting
- Rosi - Trigger requirements 2019
- Prashanth et al - Status of the GEANT
- AOB
Meeting 25 June 2018
- Shinichi - Ring-weight optimization and ring-by-ring correlation studies: drupal.star.bnl.gov/STAR/system/files/epd-cen-ep-2018Jun22.pdf
- Xiaoyu - Ring-by-ring correlation studies - drupal.star.bnl.gov/STAR/system/files/Event_plane_correlation%20.pdf
- Roland - study of primary and secondary particle production and energy loss in EPD: drupal.star.bnl.gov/STAR/blog/rolandp/analysing-particles-hitting-epd-focusing-separation-primary-secondary-particles
- Calibration plans - Mike and Skipper
- Gene Van Buren plans on physics-quality production of isobar data in mid-July
- Storage of EPD and inventory of equipment - Mike
- AOB
- Status at BNL / Shutdown plans - Justin/Prashanth/Mike/Xiaoyu
- the run is over
- final IV scan taken and EPD biases off
- BBC is being taken down
- EPD storage structure is being mounted right now
- East EPD will come down probably today
- West EPD begins tomorrow afternoon
- need to inventory
- Roland - drupal.star.bnl.gov/STAR/blog/rolandp/particles-epd-hit-analysis
- EPD/BBC correlations - Xiaoyu/Mike
- Software status (results from S&C meeting) - Prashanth - postponed until next week
- Plans moving forward - all
- calibrations - Skipper/Prashanth/Mike
- storage of EPD - Mike
- NIM paper pre-plans and Lehigh meeting
- should we continue with weekly meetings?
- AOB
Meeting 4 June 2018
- drupal.star.bnl.gov/STAR/blog/lisa/ep-resolution-and-eta-dependence-directed-flow-auau-collisions
- drupal.star.bnl.gov/STAR/blog/lisa/phi-weighting-and-optimizing-ring-weights-auau-27-gev
- drupal.star.bnl.gov/STAR/blog/lisa/subtle-flow-and-anti-flow-patterns-visible-epd-auau-27-gev
- drupal.star.bnl.gov/STAR/blog/lisa/v1-analysis-charged-particles-auau-27-gev
- https://drupal.star.bnl.gov/STAR/blog/rolandp/epd-vertex-analysis-x-y-plain-different-z-cut-selections-3-different-zooms-x-y-plain
Meeting 28 May 2018
First half
- Status at BNL
- AUM posters
Meeting 23 May 2018
First half
- Status at BNL
- Some of Mike's posts since our last meeting (we don't have to go through these):
- EP resolution
- Looks good in isobar run drupal.star.bnl.gov/STAR/blog/lisa/ep-resolution-epd-and-bbc
- Looks bad in Au+Au drupal.star.bnl.gov/STAR/blog/lisa/first-look-ep-resolution-27-gev-auau
- Uniformity/nonuniformity, ring by ring: drupal.star.bnl.gov/STAR/blog/lisa/uniformity-and-nonuniformity-ring-ring
- "back scatter" from BBC? Material on East side?
- Hits seen in EPD when BBC tiles see nothing
- Is there a large "BBC inefficiency?" Au+Au looks quite similar to isobar data
- Isobar data: drupal.star.bnl.gov/STAR/blog/lisa/epd-hit-positions-when-bbc-tile-sees-nothing
- Au+Au data: drupal.star.bnl.gov/STAR/blog/lisa/epd-hits-when-bbc-tiles-see-nothing-auau-case
- The EPD signal is well inside the gate in the Au+Au run: drupal.star.bnl.gov/STAR/blog/lisa/gate-timing-2018-auau-27-gev-run
- Any "apparent" differences are due to the higher flux in the isobar data, as discussed here: drupal.star.bnl.gov/STAR/blog/lisa/comparing-adc-distributions-isobar-and-auau-data-2018-run
- EP resolution
Meeting 7 May 2018
First half
- Status at BNL
- 27 GeV running
- Landau Fluctuations
- Simulation update - Mate
Meeting 23 April 2018
First half
- Status at BNL - Joey
- shut-down plan
- FXT running - Rosi
- Vertex Resolution - Rosi
- Simulation status - Prashanth
- QM posters - status and plans: Joey, Justin, Isaac
Meeting 16 April 2018
First half
- Status at BNL - Joey
- any issues on the newly-swapped in daughter cards?
- A study of "ring weights" to optimize sensitivity to the event plane. -Mike Link - drupal.star.bnl.gov/STAR/blog/lisa/optimizing-ring-weights-find-2nd-order-event-plane
- analysis of BBC and EPD in isobar data - Joey
- regarding EPD and BBC event plane resolutions - Mike - drupal.star.bnl.gov/STAR/blog/lisa/bbc-performing-better-epd
- GSTAR progress - Prashanth
Meeting 9 April 2018
First half
- Status at BNL - Robert, Joey, Justin, Prashanth
- Shall we swap in the repaired daughter cards? When?
- Steve's email here
- Discussion on changing Vbias
- Mike's discussion of adding Landau fluctuations (and also on what "having no mean" means)
- Rosi's discussion of adding Landau fluctuations, along similar lines. Also, her updated centrality study where she artificially reduces the range of the ADC
- First analysis of Fast Offline picoDsts and first estimate of event plane resolution for the 200 GeV isobars - link here
- Analysis software - Mike
- All is complete! MuDst, picoDst, Utilities. All is committed, installed, works very well :-)
- 250k events in under two minutes (not trivial "read-and-plot"!)
- Geant/GSTAR progress - Prashanth www.star.bnl.gov/protected/bulkcorr/prashanth/EPD/geant/PrashanthS_04082018.pdf
Meeting 2 April 2018
First half
- Status at BNL - Justin, Prashanth
- Ongoing QTC problems and how to address them. Register read-back, swap, remap, etc. - all
- Offline software - Mike
- EPD in picoDsts - Jerome has not found time to move on this
- All else is completed
Meeting 19 March 2018
First half
- Status at BNL - Joey
- QT32C Issues - Rosi, Justin, Gerard, Stephen
- 4 QT32C channels that have some out-of-time contribution for all ADC values
- QT32C channels that have this behavior where the average ADC changes
- (Are the shift crew catching these and starting and stopping the runs?)
- drupal.star.bnl.gov/STAR/system/files/RReedEPD03192018.pdf
- drupal.star.bnl.gov/STAR/blog/jewigleb/list-epd-runs-and-boards-issues
- Online plots discussion - Changes? Updates? Additions?
- Triggering
- Rosi's Presentation to the Triggerboard: drupal.star.bnl.gov/STAR/system/files/RReedEPDTriggerboard03192018.pdf
- Prashanth's blog: drupal.star.bnl.gov/STAR/subsys/epd/operations-2018/trigger-commissioning
- EPD group duties
- Online monitoring
- Shiftlog
- On call experts
- Some results of epc, bbc, tof comparisons, plus spectra from all channels, etc:
Meeting 12 March 2018
First half
- Status at BNL - Rosi
- QT 32B Replacement - Joey
- Connector issue - Joey
- Mapping/Scans/Etc - Rosi
- Trigger Group
- Bit Timing?
- TAC distributions
- Zero Suppression?
First half
- Status at BNL - Joey
- Latest Seven-Patterns map test - Mike
- procedure: drupal.star.bnl.gov/STAR/blog/lisa/how-check-mapping-vped-patterns-step-step
- result - mapping is correct: drupal.star.bnl.gov/STAR/blog/lisa/epd-mapping-correct-4-march-2018
- EPD-BBC correlations in pre-beam 2018 cosmics - Mike
- Database update - Prashanth
- Trigger group needs? - Rosi
- We need to wrap up the "swapping" if possible.
- Shift crew guide - Joey and Justin
- All:
- Readiness update (beam could come this week!)
- Vbias scan / gain-matching ready? (Mike)
- Gate timing scan ready? (Mike)
- what else?
- Schedules: who will be at BNL, when?
- Readiness update (beam could come this week!)
- Neural network progress - George Halal
- Presentation: drupal.star.bnl.gov/STAR/system/files/EPDMeeting_030518_GeorgeHalal.pdf
- Additional plots can be found at: drupal.star.bnl.gov/STAR/blog/rjreed/machine-learning-epd-centrality
- analysis software update - more progress - Mike
- EPD fully into StEvent, in dev - done last week
- StEpdUtil committed and in dev - done last week
- StEpdHitMaker committed and in dev - done last week
- new: EPD is now officially in STAR muDst (thanks Daniel B!)
- new: EPD and BBC geometry and mapping classes in StRoot/StEpdUtil
- decided: stay with StTriggerData::bbcXXX methods in muDst; no new classes
- upcoming: discussing EPD and BBC in picoDst. Expect progress this week.
First half
- New meeting time 11:00 okay?
- News from Ops meeting
- Vped-based mapping from "TUFF space" to "StEvent space" - Prashanth/Rosi/Mike
- current status - problems with PP09TT01 on both East and West - drupal.star.bnl.gov/STAR/blog/lisa/seven-pattern-mapping-verification-problems-pp09ss01
- Mapping fixes summary: drupal.star.bnl.gov/STAR/subsys/epd/operations-2018/mapping
- Vped adjustment - Rosi - drupal.star.bnl.gov/STAR/blog/rjreed/vped-scan-2018-setting-nominal-values
- First cosmic check! - Rosi - drupal.star.bnl.gov/STAR/system/files/CosmicAdc_small_Day056.pdf
- analysis software status - progress! - Mike
- EPD fully into StEvent, in dev
- StEpdUtil committed and in dev
- StEpdHitMaker committed and in dev
- code for EPD in muDst in hands of Daniel B. He will commit "soon" (today?)
- picoDst is next
- implement same for BBC??
- epd-specific triggers and streams in current run - Rosi
Meeting 19 February 2018
First half
- Status at BNL - Prashanth/Joey/Justin
- A fun way to test a serious issue - verifying the map from "TUFF space" to StEvent - Rosi and Mike
- See Mike's blog page: drupal.star.bnl.gov/STAR/blog/lisa/checking-mapping-all-way-tuff-box-stevent-and-mudst
- Plans for this week - drupal.star.bnl.gov/STAR/system/files/12feb2018schedule.pdf
- continued map verification - Rosi/Mike/Joey/folks at BNL
- Vped adjusting
- I-V scans
- shift user's manual (just to keep it on the radar) - Joey/Justin
- Cosmic triggers for this week - Rosi
- TOF-EPD cosmic trigger?
- TOF-BBC cosmic trigger?
- Run readiness - first day commissioning
- have "timing scan" macros ready! - Mike
- have "bias scan" macros ready! - Mike
- other?
- analysis software status (StEpdHitMaker, StEpdHitUtil, StEvent, muDst, picoDst) - Mike
- works well (see item above!). Review and commit process has stalled. Situation will soon become critical.
- simulation software status - Prashanth
Meeting 12 February 2018
First half
- Status at BNL - Prashanth/Joey/Rosi
- Database/GUI/etc coordination - status and what remains to be done?
- Mapping: are we robust against future mistakes?
- Light leak testing status
- Source testing results
- BBC installation schedule
- Cabling schedule
- Pre-beam commissioning schedule - Rosi, Mike, all
- An incomplete straw-man: drupal.star.bnl.gov/STAR/blog/lisa/epd-schedule
- analysis software status (StEvent, muDst, picoDst) - Mike
- simulation software status - Prashanth
- operations/calibration/access to data during isobar run - Mike
Meeting 5 February 2018
First half
- status at BNL
- fibers attached, FEE boxes assembled, Rx-to-QT started
- EQ1 needs replaced (Steve does it today)
- cannot take data now, probably due to EQ1 problem
- verified that setting Vbias and Vped (to several values) affect output at Rx cards as expected.
- mapping issues. code needs to know what TUFF/Branch/FEE/channel corresponds to what side/Position/Tile.
- Plans for this week:
- fix mapping / database
- light-leak hunt
- source test with Bill Christie (place source and look for Idark increase) - this tests the map of "channels, etc" to PHYSICAL SPACE
- verify that setting Vbias on individual tiles increases Idark on those channels (tests consistency of control and monitor maps)
- individually increase Vped for a tile, take PedAsPhys run, and run data through BFC to make uDSTs. (Tests mapping all the way from tile electronics to analyzer representation (StMuEpdHit)
- mount BBC
- perhaps... record some normal-incidence cosmic scope traces. Probably do NOT play with BBC, as per advice of Les Bland.
- Then
- pre-beam commissioning
Meeting 29 January 2018
First half
- status at BNL - the EPD is installed - Prashanth and Mike
- work to do this and next week. Preparing for pre-beam commissioning - all
- connect SiPMs to FBs (East side)
- string and connect FB (East side)
- TUFF-to-FEE connection. Terminal block and harnesses. Tim will do this Monday.
- FB-FEE connection
- get slow controls/monitor system up and running - Tonko can do this once #3 is done. He will do by (on?) Thursday.
- At this point, can begin light-tight testing (through dark currents)
- MDR cables to FEEs and RxBs
- At this point, can look at/for signals from tiles (large-angle cosmics etc)
- cable RxBs to QTs
- At this point, can begin pre-beam commissioning
- Set Vped values
- begin mapping verification through PedAsPhys runs
- I-V scan
Meeting 15 January 2018
First half
- Assembly work plan for 19-23 January - Rosi, Mike, Gerard, all
- Online controls/monitor - Prashanth
- Pre- and post-beam commissioning 2018 - Rosi, Mike
- Status of EPD integration into StRoot - Mike
- Status of EPD integration into GSTAR - Prashanth
- First use of neural networks in EPD for centrality determination - Isaac
Meeting 8 January 2018
First half
- status report from BNL and January plans
- January plans and installation schedule - Mike, Robert
- status of QT-based DAQ for cosmic tests - Rosi (will send an update)
- final determination of supersector health - Mike
- status of online controls/monitoring, if any - Prashanth
- Inclusion of EPD into StEvent and muDsts - Mike
- Inclusion of EPD into picoDsts - Yang
- EPD in GSTAR - Prashanth
Meeting 18 December 2017
First half
- report from BNL
- Test fit using strongback mock-up - Mike/Rosi/Robert
- results of cosmic testing and SS health - Mike - drupal.star.bnl.gov/STAR/subsys/epd/useful-epd-documents/hardware-documents/supersector-and-tile-healthstatus
- status of transitioning to QT-based DAQ - Rosi
- Joey - frequently-postponed cross-talk presentation
- Mike - upcoming installation schedule - drupal.star.bnl.gov/STAR/system/files/EPDsched_v2.pdf
- Software status. GEANT, StEpd - Prashanth
Meeting 4 December 2017
First half
- Joey/Te-Chuan/Rosi/Mike: first results of cosmic tests at BNL
- Photos of set-up by Mike: drupal.star.bnl.gov/STAR/subsys/epd/2017-cosmic-ray-tests-osu-and-bnl/first-autumn-2017-cosmic-tests-star
- Vertical cosmic analysis by Te-Chuan: drupal.star.bnl.gov/STAR/subsys/epd/individuals-pages/te-chuan-huang/first-results-autumn-2017-cosmic-tests-star
- Joey's presentation: drupal.star.bnl.gov/STAR/system/files/Cosmic%20Ray%20Testing%20at%20BNL.pdf
- Joey: cross-talk measurements with reflective paint over entire scintillator face: drupal.star.bnl.gov/STAR/system/files/Cross-Talk%20Reduction%20with%20Reflective%20Paint.pdf
- Rosi/Mike: plans for phases 2 and 3 cosmic test
- Justin: "worst fiber" results for the fiber bundle tests (as opposed to averages) drupal.star.bnl.gov/STAR/system/files/FiberBundle12042017.pdf
- Robert/Mike/Rosi/Joey - need for West side test installation in mid-December, and potential problems
- Prashanth: Geant implementation of EPD (drupal.star.bnl.gov/STAR/system/files/EPD_Geant_thick_part_only.png)
- Isaac/Daniel - neural net centrality and EP studies
Meeting 20 November 2017
First half
- Justin - Fiber bundle progress
- All - Any last minute thoughts for next week's testing?
- Prashanth - Geant for EPD
Meeting 13 November 2017
First half
- Justin - Clear Fiber Bundle Status Spreadsheet - https://docs.google.com/spreadsheets/d/1u5dWDUeguvjiPTBiH32b--NCzr-gS7l-ocCTeo5hBF0/edit?usp=sharing
- Prashanth - Geant for EPD http://www.star.bnl.gov/protected/bulkcorr/prashanth/EPD/vsp_gstar_111017.pdf
- Rosi - Centrality Dependence by Energy drupal.star.bnl.gov/STAR/system/files/RReedEPD11132017.pdf
Meeting 23 October 2017
First half
Second half
- Mike - Fit Method revisited drupal.star.bnl.gov/STAR/system/files/23Oct2017.pdf
- Yang - v2 in 54 GeV Au+Au - drupal.star.bnl.gov/STAR/system/files/yang_epd_v2_update2.pdf
Meeting 16 October 2017
First half
- Wanbing He - Preliminary ideas for monitoring/slow-control page.
- Prashanth - implementing the database
- Mike - Calibrating the data for Au+Au 54 GeV - 93 down, 651 to go!
- Mike - Using CALIBRATED picoDsts and a first analysis on them. StEpd and first (flawed) results.
Meeting 09 October 2017
First half
- Mike
- status at BNL
- upcoming activities including proposed cosmic tests at BNL: drupal.star.bnl.gov/STAR/system/files/Pre-run%20cosmic%20tests.pdf
- November Analysis meeting plans
- Prashanth/Wanbing/Te-Chuan - initial plans for Slow Controls & monitoring interface
- Prashanth - database status (& corrections)
- Xinyue - analysis of Au+Au 54 GeV
Meeting 02 October 2017
First half
- Mike - First half of EPD arrives at BNL, and health report: drupal.star.bnl.gov/STAR/system/files/HealthReport02oct2017.pdf
- Joey - production crosstalk testing.
- Justin - brief update of status of clear fiber bundle production at Lehigh
Meeting 25 September 2017
First half
- Wanbing He: - fine-grained heat maps using source and x-y table:
- Te-Chuan Huang - vertical cosmic tests
- Mike Lisa - plans for bringing detector and people to BNL next week
Meeting 18 September 2017
First half
- Wanbing He - heat maps using source and x-y table
- 2 cm x 2 cm scan of SS06 - drupal.star.bnl.gov/STAR/system/files/heatMap.pdf
- presentation: drupal.star.bnl.gov/STAR/system/files/EPD_currentTest_0918wanbing.pptx
- Te-Chuan Huang - vertical cosmic tests
Meeting 11 September 2017
First half
- Justin & Rosi - status of fiber bundles; personpower issues
- Last WSL will be done today/tomorrow
- CL: All tubing prepped, all connectors prepped, cutting fibers + gluing will commence
- At BNL -> Hanseul + Yang have volunteered
- At Lehigh -> Possibility of some Russian collaborators
- Isaac - status of SS production
- Supersector tests
- Rosi - analysis of cosmic test data
- Presentation at: drupal.star.bnl.gov/STAR/system/files/RReedEPD09112017.pdf
- Blog with all the gory details: drupal.star.bnl.gov/STAR/blog/rjreed/cosmic-ray-data-configurations-12-and-3
- Tile by tile comparison: drupal.star.bnl.gov/STAR/system/files/ZeroAdcAll.pdf
- Wanbing - source scan analysis - drupal.star.bnl.gov/STAR/system/files/EPD_currentTest_0911_wb.pptx.pdf
- Rosi - analysis of cosmic test data
- Robert - anything to report on the support structure?
- Robert and ALL - upcoming activities at RHIC - FEE box, cosmic testing, storage, November analysis meeting (EPD in-person meeting)
- see the latest shutdown schedule here. EPD FEE box installation is scheduled for mid-November. EPD installation & commissioning scheduled for late January
- Further discussion on Rosi's UrQMD-based centrality study?
- What can we show at the November analysis meeting?
- AuAu 54 GeV?
- Cosmic data
- Simulations --> UrQMD + GEANT4!
11 September 2017 - Labor day in U.S. - Meeting cancelled
Meeting 28 August 2017
First half
- First coarse heat map of SS06. - Mike. blog at https://drupal.star.bnl.gov/STAR/blog/lisa/first-heat-map-ss06
- UrQMD simulation - Centrality and Effiency - Rosi: drupal.star.bnl.gov/STAR/system/files/RReedEPD08252017.pdf
- Note: I ran out of time a bit, I will write a more detailed blog, etc. Sorry for the mess!
First half
- Analysis of cosmics in OSU test stand - Rosi
Meeting 14 August 2017
First half
- Analysis of cosmics in OSU test stand - Rosi
- Plans for heat map of supersector - Mike - drupal.star.bnl.gov/STAR/blog/lisa/making-heat-map-position-dependent-response-epd-supersector
- QT needs and mapping for Run 2018+ - Rosi
- dense-packing scheme - drupal.star.bnl.gov/STAR/system/files/2018qtMap.pdf
- Cable-length considerations for Rx-to-QT (if needed) - Prashanth
- Status of production at Lehigh and OSU. SS / WLS / Clear
- Optical Grease Test - Justin - https://drupal.star.bnl.gov/STAR/system/files/EPD%20Meeting%208-14-17.pdf
- Using StEpd on STAR picoDSTs - Mike
- first look at v1 with EPD - Yang - drupal.star.bnl.gov/STAR/system/files/54GeV_ZDC-SMD_v1Eta_with_EPD_Update3.pdf
- Pico's are at: /star/data06/EPD/ywu27/pico/picoDSTs/
Meeting 31 July 2017
- Fiber tests - Justin: https://drupal.star.bnl.gov/STAR/system/files/EPD%20Meeting%207-31-17.pdf
Meeting 24 July 2017
- Clear Fiber tests: George: drupal.star.bnl.gov/STAR/system/files/GeorgeHalalPolishingEffects07-20-17.pdf
- First cosmic tests -- SS05 drupal.star.bnl.gov/STAR/system/files/FirstCosmics.pdf
Meeting 17 July 2017
- Status of simulations: https://www.dropbox.com/s/
73ddkbhnmvpnpc1/vsp_gstar_ 071717.pdf?dl=0 - Clear fiber testing: https://drupal.star.bnl.gov/STAR/system/files/LED_Test_Box%20_7-17-2017.pdf
- Pictures of FFC Connectors from 4 bundles: https://drupal.star.bnl.gov/STAR/system/files/4%20Clear%20Fiber%20Connectors%207-13-2017%20George%20Halal.pdf
Meeting 10 July 2017
- EPD dismount and storage report
2nd half of meeting:
- Kazuya - event-plane studies - https://drupal.star.bnl.gov/STAR/system/files/0711_nakagawa_epdmeeting.pdf
- All - generating a request for a "small" production of 54 GeV data
Meeting 3 July 2017
Hanseul: dN/deta toy model: drupal.star.bnl.gov/STAR/system/files/3Jul17_EPD_dNdeta.pdf
Meeting 26 June 2017
Mike: How to extract pseudorapidity distributions from high-multiplicity data.
(We do not have to discuss this in excruciating detail...)
drupal.star.bnl.gov/STAR/blog/lisa/measuring-pseudorapidity-distribution-epd
Rosi: Questions -> Where are we going to store the quarter wheel? How is the EPD being transported to BNL? EPD storage cart?
George Halal: Initial studies of offline EPD trigger
drupal.star.bnl.gov/STAR/system/files/EPD%20Meeting6-26-17George%20Halal.pdf
Meeting 19 June 2017
Rosi: drupal.star.bnl.gov/STAR/system/files/RReedEPD06192017.pdf
More complete analysis, including PDFs of all 93 channels and their associated ADC, TDC and TAC values can be found at: drupal.star.bnl.gov/STAR/blog/rjreed/auau-54-gev-triggers-and-eval-part-1
For those who may be interested in vertexing, multiplicity in the 54 GeV data, look at (not to be discussed): drupal.star.bnl.gov/STAR/blog/rjreed/auau-53-gev-evaluating-performance
Mike: In Au+Au collisions at 54 GeV (much higher than the multiplicities that drove the design of the EPD), we expect very significant multi-hit events on the tiles. In fact, this analysis based on central Au+Au collisions at 62.4 GeV published by PHOBOS, indicated that the average hit multiplicity on a tile would be greater than 1.
And indeed, this is what we see, as shown on the following page:
drupal.star.bnl.gov/STAR/blog/lisa/multi-mip-events-2017-epd-auau-54-gev
Most particles are not coming from single-hit events. So, we will need to be careful not to show "real quick dN/deta distributions," as they will be way off.
Justin:
Fiber polishing and bundle creation at Lehigh
drupal.star.bnl.gov/STAR/system/files/Fibers%2C%20EPD%20Meeting%206-19-17.pdf
drupal.star.bnl.gov/STAR/system/files/SS%25231_Fibers%281%29.pdf
Sam:
Simulation update
drupal.star.bnl.gov/STAR/system/files/sim_EPD_update06192017.pdf
Meeting 5 June 2017
1) Mike: TDCvsTAC
It turns out that all QT channels have a TDC in addition to the ADC they put out. Supposedly it is a 5-bit TDC, but Hank reports that he's only seen 4 bits fire (returned value 0..15). I have verified this in the EPD QTB boards, and find that the TDC is linearly proportional to the TAC, in the one QTB board that has a TAC. You may find the picture here:
drupal.star.bnl.gov/STAR/system/files/TDCvsTAC.png
This could be useful in data analysis, for ALL channels (even the QT32Bs that will not have TAC, which is 75% of the EPD channels in 2018+). I expect (though it has not been tested) that we can require TDC not equal zero, and be looking at in-time hits..
The TDC information is now included in the StEpdTile data object.
The following plots are ADC distributions, where the blue curves correspond to TDC!=0 and the red curves are for TDC=0.
drupal.star.bnl.gov/STAR/system/files/ValidTDCstudy.pdf
The TDC would seem to be an excellent way to discriminate noise/out-of-time signals from real particles. Much more convenient than an ADC threshold..... Except for a couple of bins, where the behaviour is precisely opposite to that expected. This needs to be investigated.
More detail: drupal.star.bnl.gov/STAR/system/files/TDCstudy.pdf
2) Polishing at Lehigh:
drupal.star.bnl.gov/STAR/system/files/FiberPolishing06052017.pdf
drupal.star.bnl.gov/STAR/system/files/FiberPolishing06052017_pics.pdf
Meeting on 5/22/2017
1) Prashanth: Short update/summary of the situation with the QTs and new FEEs
www.star.bnl.gov/protected/bulkcorr/prashanth/EPD/weeklymeetings/PrashanthS_05222017.pdf
www.star.bnl.gov/protected/bulkcorr/prashanth/EPD/weeklymeetings/PrashanthS_05222017.pdf
Meeting on 5/16/2017 - at BNL during STAR Collaboration Meeting
Tuesday evening at 6:30 with pizza
Current run
- Prashanth - 2017 operations- Prashanth_CollMeeting_05162017.pdf
- *brief* review of various scans, gain-matching, etc
- dark current drupal.star.bnl.gov/STAR/system/files/RosiReedDarkCurrent05152017.pdf
- Rosi - trigger update
- QT32c status
- DSM bit-checking
- drupal.star.bnl.gov/STAR/system/files/RReedEPD_05160217_STARmeeting.pdf
- Joey - supersector construction status - drupal.star.bnl.gov/STAR/system/files/JoeyEPDStatus.pdf
- Justin/Rosi - fiber testing & bundle production schedule drupal.star.bnl.gov/STAR/system/files/JustinFiber.pdf
- Robert - mechanical support status drupal.star.bnl.gov/STAR/system/files/PakBNL2017v2b.pdf
- Prashanth - online & (mostly) offline software status
- Sam - EPD simulations drupal.star.bnl.gov/STAR/system/files/Heppelmann_geant_update.pdf
- XX - analysis plots
- all - plans for remainder of 2017 run
- toward a "standard set of procedures" for operations 2018+
- AOB
Meeting on 5/08/2017
1) Rosi - BBC-EPD correlations: drupal.star.bnl.gov/STAR/system/files/RReedEPDBBCCorr05092017.pdf
BBC - EPD timing studies: drupal.star.bnl.gov/STAR/blog/rjreed/epd-timing-correletion-slew-correction-vs-bbc-ii
Trigger, etc.
2) Justin - Fiber polishing and testing at Lehigh:
On the hardware page under "Useful EPD Documents": drupal.star.bnl.gov/STAR/system/files/Justin%20Polishing%20Testing.pdf
Also at: http://www.star.bnl.gov/protected/bulkcorr/prashanth/EPD/Polishing_Testing_Justin_05082017.pdf
Meeting on 5/01/2017
1) Rosi - EPD-BBC timing studies & QT32C spikes - drupal.star.bnl.gov/STAR/blog/rjreed/epd-timing-correletion-slew-correction-vs-bbc
2) Prashanth - status at STAR
Also, discriminator study: drupal.star.bnl.gov/STAR/subsys/epd/operations-2017/discriminator-threshold-scan
3) Rosi - status of trigger coordination, including trigger bit test, etc.
4) Gerard - status/plans for FEE upgrade drupal.star.bnl.gov/STAR/system/files/gain_change_update.pdf
5) Mike - status/plans of EPD construction at OSU
6) Mike - ADC spectra with TAC cut - drupal.star.bnl.gov/STAR/system/files/ADCfitsTACcut_Lisa28apr2017.pdf
7) All - availability for in-person EPD session at STAR Collaboration Meeting
8) All - Plans for the coming week
Meeting on 4/24/2017
1) Rosi's blog:
drupal.star.bnl.gov/STAR/blog/rjreed/epd-analysis-32b-vs-32c-timing-correlations-etc
One important point: best START for QT32Bs is -8 and best START for QT32Cs is -20
www.dropbox.com/s/rbgzbbuhqfev1kr/BBCEPDCorr.pdf
3) Mike timing
www.dropbox.com/s/bn5wpxxj8gmm2qv/Timing.pdf
EPD To-Dos:
1) Confirm 32C settings - Change Tier 1 file!
2) Threshold Scan (32B first, then 32C once the above is accomplished)
3) DSM Bit checking
4) Software in CVS?
Meeting on 4/17/2017
1) Prashanth (software)
Mike's StEpd analysis software: /star/u/lisa/StEpd/
Database related
https://drupal.star.bnl.gov/STAR/blog/sprastar/epd-offline-db-table
https://online.star.bnl.gov/dbExplorer/
Meeting on 4/10/2017
1) Status of QT32Cs - Prashanth, Rosi, Gerard, Hank(?)
2) Bias scan - Mike
drupal.star.bnl.gov/STAR/subsys/epd/operations-2017/bias-scan
Meeting on 4/03/2017
0) Status - Prashanth, all
1) Prepost 32c vs 32b
2) Gate scan + conclusions
drupal.star.bnl.gov/STAR/system/files/GateScan_1.pdf
Summary:
- QT32B likes START=-8 (as we concluded before)
- QT32C likes START=-20
- we see the "left edge" of the drop-off reasonably well
- Gate scan concluded
4) Bias Scan - Rosi has produced files for analysis; Mike has not yet analyzed them.
5) Gerard, all: interpretation of QT32C messages
6) Dark current:
- Mike - How much dark current is too much? drupal.star.bnl.gov/STAR/system/files/DarkCurrentCalculations.pdf
- Rosi
- Dark Current: Zoomed out: drupal.star.bnl.gov/STAR/system/files/h_DarkCurrent_Nhours920.pdf
- Zoomed in to 1 uA front page: drupal.star.bnl.gov/STAR/system/files/DarkCurrent_Nhours920.2017Mar26_115604_zoom.png
- Full pdf zoomed into 1 uA: drupal.star.bnl.gov/STAR/system/files/h_DarkCurrent_Nhours920_zoom_1uA.pdf
7) Rosi - IV scan histograms: drupal.star.bnl.gov/STAR/system/files/IvscanHistos_03_26_2017.pdf
7.5) Sam - First steps with GEANT4 EPD: drupal.star.bnl.gov/STAR/system/files/EPD_geantSTARSIM_0.pdf
8) (If time) - Rosi: First steps with UrQMD: drupal.star.bnl.gov/STAR/system/files/RReedEPD03272017.pdf
8.5) Rosi: Starting to look at BES data (7.7 GeV): drupal.star.bnl.gov/STAR/system/files/RReedEPD04032017.pdf
9) Tasks for the coming week.
- From last week: 1,2 are done; 3 is canceled; 4 is done but not analyzed. 5....?
- New tasks
Meeting on 3/27/2017
1) Prashanth, all:
- Current problems - CAMAC PS?
- Plans for access
- do not swap QT32C inputs with QT32B for now (see "steps for this week" below)
2) Mike - Gate scan study
- Where all files including these studies sit. drupal.star.bnl.gov/STAR/subsys/epd/operations-2017/timing
- Gate scan over full range [-16,+48]: drupal.star.bnl.gov/STAR/system/files/GateScan_FullRange_0.pdf
- Gate scan over [-16,+16] and plateau identification for QT32Bs drupal.star.bnl.gov/STAR/system/files/GateScan_0.pdf
- Same study but with a focus on the QT32Cs: drupal.star.bnl.gov/STAR/system/files/GateScan.pdf
3) All: Next steps for this week
- get trigger guys to put us in PrePost=0
- continue gate scan to "more negative" values to find QT32C plateau and final gate delay value
- swap inputs of QT32C with a QT32B to check gain (why this is not already known from the lab...??)
- Bias scan
- step size, range
- what is figure of merit? "MIP position matching"? Separation from dark current?
- operationally - take-a-run, burn-a-run while switching, take-a-run...?
- TAC ajustment - will need Jack's help (Gerard will be at BNL?)
4) Dark current:
- Mike - How much dark current is too much? drupal.star.bnl.gov/STAR/system/files/DarkCurrentCalculations.pdf
- Rosi
- Dark Current: Zoomed out: drupal.star.bnl.gov/STAR/system/files/h_DarkCurrent_Nhours920.pdf
- Zoomed in to 1 uA front page: drupal.star.bnl.gov/STAR/system/files/DarkCurrent_Nhours920.2017Mar26_115604_zoom.png
- Full pdf zoomed into 1 uA: drupal.star.bnl.gov/STAR/system/files/h_DarkCurrent_Nhours920_zoom_1uA.pdf
5) Rosi - IV scan histograms: drupal.star.bnl.gov/STAR/system/files/IvscanHistos_03_26_2017.pdf
6) Joey - BBC-EPD correlations - drupal.star.bnl.gov/STAR/system/files/EPD%20Presentation.pdf
7) (If time) - Rosi: First steps with UrQMD: drupal.star.bnl.gov/STAR/system/files/RReedEPD03272017.pdf
Meeting on 3/20/2017
1) Mike: PrePost study of runs 1806643, 18076064 and 18076065:
drupal.star.bnl.gov/STAR/system/files/Study18066043and18076064and18076065all.pdf
(This study under the Operations 2017 child page)
2) Mike: Draft (v1) of trigger documents shared with trigger group and to be discussed 21march2017:
drupal.star.bnl.gov/STAR/system/files/EPD%20Trigger%20Requirements%20v1.pdf
3) Mike: First Gate Scan study. This will need to be revised, as discussed on first page of this document.
drupal.star.bnl.gov/STAR/system/files/GateScan_PrePostIndex2.pdf
(This study under the Operations 2017 child page)
Meeting on 3/13/2017
1) Mike: TAC-selected spectra from run 18067001: drupal.star.bnl.gov/STAR/system/files/Run18067001_spectra.pdf
Also, drupal.star.bnl.gov/STAR/system/files/FitValidTACadcSpectrum.pdf
Meeting on 3/6/2017
1) Mike: Spectra Fits from vbias 56.5V data: drupal.star.bnl.gov/STAR/system/files/MLisaEPDFits03062017.pdf
2) Rosi: Vbias comparison: drupal.star.bnl.gov/STAR/system/files/h_CompareVolt03052017_Vbias56_5_v3.pdf
How shall we set these values? (Above needs to be repeated with the better vped values and with Jack's new Tier1 file.)
Meeting on 2/27/2017
1) Rosi - Tested the detector by increasing the Vbias in each channel by 5 V. The dark current increased, one can see it at:
drupal.star.bnl.gov/STAR/system/files/h_DarkCurrentHistogram_Nhours149.pdf
The current increase is at the end.
Plot of the pedestal per channel:
https://drupal.star.bnl.gov/
Only one channel is "fat" and it should be determined whether it is FEE, QT, or Receiver
Dark Current as of this morning:
drupal.star.bnl.gov/STAR/system/files/h_DarkCurrent_Nhours288.pdf
Gerard asked what happens if we decrease ymax to 0.3nA, see:
drupal.star.bnl.gov/STAR/system/files/h_DarkCurrent_Nhours288_ymax03.pdf
Lehigh schedule for WSL fibers:
drupal.star.bnl.gov/STAR/system/files/epd_schedule_Lehigh_WSL.pdf
Also note, Prashanth has added it to the online monitoring!
2) Prashanth - Timing in, inclusion to StRoot
3) Sam - Adding EPD to the STAR GEANT:
drupal.star.bnl.gov/STAR/system/files/Epd_Geant.pdf
Meeting on 2/20/2017
1) Rosi -
VPed Setting: Code is at /gpfs01/star/subsysg/EPD/VpedDet/
Summary: drupal.star.bnl.gov/STAR/system/files/RReed_EPD_02192017_Vped.pdf
1 set of fits: drupal.star.bnl.gov/STAR/system/files/h_Vped.pdf
Vbias: Code is at /gpfs01/star/subsysg/EPD/IVScan
Summary: drupal.star.bnl.gov/STAR/system/files/RReed_EPD_IVscan_02192017.pdf
Dark Current: Code is at /gpfs01/star/subsysg/EPD/
Summary: drupal.star.bnl.gov/STAR/system/files/RReed_EPD_IVscan_02192017.pdf
Scan at of 10:30 am: drupal.star.bnl.gov/STAR/system/files/h_DarkCurrentHistogram_EPD02202017.pdf
Note: I did an IV scan, which we can see the evidence of. Also, I am unsure why one of the boards is not showing any movement. I will check on this during the week.
Open questions: When can we be timed in? Shift crew instructions? Monitoring at: https://online.star.bnl.gov/epd/ ? MuDst?
2) Prashanth -
online monitoring page here: https://online.star.bnl.gov/
Notes: Prashanth is discussing with Akio the best way to incorporate our detector in the MuDsts. The question is where does the mapping get picked up, which is currently being picked up in the trigger data.
Action items for Rosi:
*Test the detector by setting Vbias = Vbias + 5 V to see that the dark current has increased.
*Plot the pedestal distributions per channel.
*Touch base with Akio/Tonko about the functionality of the standby mode and whether it is needed for pedstal runs.
*Fix Vped for 3 channels not connected to an EPD tile
*Touch base with Prashanth to see what software tasks can be distributed so he can concentrate on incorporating the EPD into the MuDst
*Ask to have the IV Scan + Pedestals taken via the shift crew (pending the answer from Akio/Tonko).
We also discussed the need for documentation, at the moment things are a bit chaotic. This will improve our ability to distribute tasks.
Old BlueJeans connection info.
Want to dial in from a phone?
Dial one of the following numbers:
-
+1.408.740.7256(United States)
-
+1.888.240.2560(US Toll Free)
-
+1.408.317.9253(Alternate number)
Enter the meeting ID followed by #
Connecting from a room system?
Dial: 199.48.152.152 or bjn.vc and enter your meeting ID
»
- Printer-friendly version
- Login or register to post comments