aliceb's blog - Timing Scans for the Endcap: Take 0 - January 5., 2009
- Timing Scans for the Barrel: Take 0 - January 14., 2009
- Timing Scans for the Barrel: Take 1 - January 20., 2009
- Timing Scans for the Endcap: Take 1 - January 23., 2009
- Individual tower fits for timing scans - January 26., 2009
- ZDC SMD Data Analysis - January 30., 2009
- Timing Scans for the Endcap: Take 2 - January 30., 2009
- EMC Meeting 2 February 2009 - February 2., 2009
- Conversions in QCD MC - February 6., 2009
- EMC Update for February 9 2009 - February 9., 2009
- Updating ZDC SMD Data Analysis for 4 Spin States - February 9., 2009
- Timing scans for the barrel preshower & shower max: Update - February 16., 2009
- Conversions in QCD MC: Adding a Hadronic Veto - February 18., 2009
- ZDC ADC Spectrum - February 18., 2009
- Updated barrel preshower spectra - February 20., 2009
- Timing analysis instructions - February 20., 2009
- Updated barrel shower max scans - February 20., 2009
- ZDC Code Check with Trigger Files (Plus Detailed Instructions) - February 24., 2009
- Testing Run 10049077 - February 25., 2009
- ZDC Pol analysis: runs 1060035-37 - March 2., 2009
- Some BSMD spectra - March 2., 2009
- BSMD and BPRS timing runs 10060041-54 - March 3., 2009
- ZDC Pol Analysis: runs 10063009-10063016 - March 4., 2009
- Analyzing runs 10066001-114 - March 7., 2009
- BTOW timing runs 10065031-45 - March 8., 2009
|