Sort by:[Date]

Run 9 Calibr & QA

There are several things collected w/ this entry:

**********************************************************

I. 1st DRAFT OF BPRS HV SETTINGS

Cut Variable and Kinematics Distributions

 Plots and description are in the attached .pdf file (warning: large file).

 

Run9 BTOW HV Mapping Analysis - Part 1

It has been seen that a number of towers are not where we think the are in the HV system (probably a bunch of cables are switched).

The BBC beam background scalers saga

 While studying scalers for SpaceCharge calibration of Run 8 data last summer, I found that the BBC beam background scalers were clearly You do not have access to view this node (regarding which one

Opened simulation requests 20090304

 

Table summary - simulations in priority order.

toward BTOW HV mapping

 The following runs were taken on March 3rd, runs 10062047-61

 Table 1.

Some BSMD spectra

Figure 1: BSMD eta plane spectra for 8 crates, run 10060041

Trial HV Mapping Test

For this test, I looked at ADC spectra for towers from runs 10058089, 10058090, and 10058092.  For each channel I calculated the pedestal and sigma by fitting to a gaussian, then calculated th

ESMD box delay calibration curve

This is a plot of the ESMD MAPMT box delay time as a function of the box delay control register value 0-1023.

Abstract - Hadron Production ALL : CIPANP 2009

 Abstract - Hadron Production ALL : CIPANP 2009