Sort by:[Date]

200 GeV paper

CIPANP 2015 slides

 

p-Au AN Day 126-128

 See attached file.

pAu An Day126

With only one day's data, the FMS is showing an indication of large TSSA (AN) for  pi0 production  in pAu collisions at large pT. This could be really exciting.

pAu bXing Distributions

NPE in Run14 Au+Au 200 GeV Meeting Minutes by Zhenyu - 2015/05/08

1) Run14 Data&nbsp

Comparison of Run 15 pp200 and pAu200 beamlines

I have been informed be Elke that a 3.58 mrad change in the horizontal BeamLine angle was expected going from Run 15 pp200 to Run 15 pAu200 operation.

Run15 pAu 200GeV TOF3*VPDMB-30 trigger

Motivation:

run 15 p+Au 200GeV

run number:
16125053

Production: fastoffline

Day126 (P-Aui) fms first look

This is an analysis of Day126 data (P-Au) from the FMS with updated high voltages based analysis from Day 113 .

Invariant Mass Matching

a) dR plots

b)Detector to Particle Inv Mass matching (trigger combined)

c)Detector to Particle Inv Mass matching (trigger separated)