STAR Protected
Detailed operations manual
Over the years I have maintained a text based operations manual for the EEMC. It has a lot of expert information and detail in it.
Comparison of material in TPC at forward angles in between sector boundaries
pp500 W M-C request w/o embedding
Summary of W M-C request for APS
(updated Jan 8, 2010)
Requirements:
Plan for the "Decadal Plan"
Updated on Wed, 2010-01-13 17:57 by nxu. Originally created by rexwg on 2009-12-28 15:21.Speaker : Nu Xu
Talk time : 09:00, Duration : 00:20
evaluation of SL09g Dec28 production 'sample'
This age summarizes evaluation of 'W-sample' produced by Lidia on Dec 27, 2009 with the final version of SL09g library.
y2009a geometry status, take 2
Away-Side veto for W-algo : ver 2
Away-Side veto for W-algo
Old Away-Side veto:
Update
Speaker : Andrew Gordon
Talk time : 14:40, Duration : 00:20
pp2pp Collaboration Meeting
1-189, at 19:00 (GMT), duration : 01:00
Please use headsets if you are using a laptop to avoid echo. Otherwise please mute when you are not talking, for the same reason.
1. Update from Andrew
2. Update from Donika - is there a resolution to the alignment problem?
3. News from Kin
Description: pp2pp weekly
Community: Universe
Password: WeeklyElastic
Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoGate/koala.jnlp?meeting=ete8eavsvaauaDaIIt
- Password: WeeklyElastic
- Phone Bridge
ID: 42134
Password: 9771
EVO Phone Bridge Telephone Numbers:
---------------
- USA (Caltech, Pasadena, CA)
+1 626 395 2112
- USA (BNL, Upton, NY)
+1 631 344 6100
Time | Talk | Presenter |
---|---|---|
14:00 | Update on Alignment ( 00:20 ) 1 file | Donika Plyku |
14:20 | Asymmetry, AN and including non-golden events ( 00:20 ) 1 file | Kin Yip |
14:40 | Update ( 00:20 ) 1 file | Andrew Gordon |
More evidence on the TPCe04 missing material
HOWTO: Parse DETP command in geometry.g
STAR Management Meeting
BNL, 50-Orange Room, at 16:00 (GMT), duration : 01:00
EVO: Title: STAR Management Meeting // Community: STAR // Password: star
Phone Bridge: +1 626 395 2112 (CA) / +1 631 344 6100 (NY) // ID: 39499 // Password: 0952
Time: 11 AM - 12 PM EDT
*--===================================================================--*
I. Agenda:
1) Run10 status: Bill
2) Upgrade review discussions: Flemming/Helen
3) Decadal Plan: Nu
4) Co-convener(s) for Spin PWG: Nu
*--===================================================================--*
II. Brief Summary and/or Action Items:
0) Attendency: Flemming, Helen, Bedanga, Jamie, Nu
2) Flemming/Hellen: (a) MTD report has been sumitted to the management. Trigger rate is in discussion. MTD may competing with future detectors.
A proposal should be submitted to BNL management by the enf of January or earlier; (b) FHC: concerns about manpower issue. Spin PWG
strongly support the project. Go ahead to prepapre for run11; (c) pp2pp' : ned work to convince colaborators regarding the phsycis reach. Proponents should
continue to discuss with CAD about the design work needed for the upgrade. The time scal will be streched to the time when the MTD effort is
approaching to its end. (d) HLT: 2nd part of the proposal should be further developed. Tests shuld be made in run10 for future developements of
the project. Physics reaches should be better spelled out in the proposal. Expect the review report by the end of the month or earlier.
Trigger upgrade: Need discussion with Hank
GMT plan:R&D fund and plan to instal between FY10/11
Computing plan:
*--===================================================================--*
III. Note:
► RHIC Planning Meeting Website
► Charge for New Decadal Plan, Steve Vigdor, Dec. 17, 2009
► STAR NPE Committee, H. Huang (chair), April 2008
► STAR FMS Review: Sept. 1-2, BNL. P. Jacobs (chair). Review Report
*--===================================================================--*
IV. Future Meetings and Reviews:
► STAR Analysis Meeting: Jan. 12-16, 2010, Department of Physics, UT Austin
► APS April Meeting: Feb. 13-17, 2010, Washongton DC
► RHIC PAC Meeting: June, 2010, BNL
► RHIC Science and Technology Review: June 28-30, 2010, BNL
► Spin2010: Sept. 27 - Oct. 2, 2010, Juelich, Germany
► DNP2010: Nov. 3-6, 2010, Santa Fe, NM
Micro-Vertexing workshop, Subatech, 15-17 Dec. 2009
- "Heavy flavor correlations in STAR " A.