- BEMC
- BTOF
- DAQ
- Detector Upgrades
- Event Plane Detector
- FCAL
- GMT
- Preview of the 2006/12 review findings
- Tracking Upgrade Review Material
- eTOF Proposal
- iTPC
- An upgrade to Inner Sectors of Time Projection Chamber
- ES&H reviews
- October 2018 DOE NP review
- September 2016 iTPC NP review
- September 2017 DOE NP yearly progress review
- iTC Risk assesment
- iTPC Directors Review Jan 2016
- iTPC QA
- iTPC Quarterly Reports
- iTPC brief reports and presentations
- iTPC closeout review May 2, 2019
- iTPC meetings
- iTPC run18 progress
- iTPC NIM paper page
- EEMC
- EPD
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
Mechanic design of strongback
Updated on Fri, 2017-04-07 17:52. Originally created by xzb on 2013-10-08 08:21.
Under:
optimize strongback for more electronics readout channels and for reducing materials.
Drawings from the original TPC design
prototype iTPC strongback machining at UT Austin:
machining strongback 10/15/2013
TPC insertion tool:
»
- Printer-friendly version
- Login or register to post comments