Run 15 pAu200
Updated on Mon, 2015-05-11 16:11. Originally created by genevb on 2015-05-08 10:38.
Under:
Preliminary calibration (no tilt, from HFT):
Run 15 pAu200 preliminary 2
Final calibration?
- Xin Dong determined the position of the beam spot at z=0 in global coordinates (see the last result on this page: VPDMB purity check and vertex position check for pAu 200 GeV)
Run 15 pAu200 preliminary 2
Final calibration?
»
- Printer-friendly version
- Login or register to post comments