Run 15 pp200
Updated on Mon, 2015-05-11 16:12. Originally created by genevb on 2015-05-08 10:36.
Under:
Preliminary calibration (no tilt, from HFT):
Run 15 pp200 preliminary 2
Final calibration?
- Xin Dong determined the position of the beam spot at z=0 with respect to the center of the PXL (see the "all triggers" result of this page: Run15 pp 200 GeV beam position check)
- Transforming this to global coordinates results in (x0,y0) = (0.01,-0.24)
Run 15 pp200 preliminary 2
Final calibration?
»
- Printer-friendly version
- Login or register to post comments