- General information
- Data readiness
- Calibration
- BeamLine Constraint
- Run 10, Au+Au 200 GeV
- Run 10, Au+Au 39 GeV
- Run 11
- Run 12
- Run 13
- Run 15 pAu200
- Run 15 pp200
- Run 2 (200 GeV pp)
- Run 3 (200 GeV dAu and pp)
- Run 4 (pp)
- Run 5
- Run 6 (pp)
- Run 6: Issues with 2006 BeamLine calibration
- Run 7 (200GeV AuAu)
- Run 8 (200 GeV dAu and pp)
- Run 8 (9GeV AuAu)
- Run 9 (pp500 and pp200)
- Run 9, pp200 GeV Full Field (FF) - new calibration (May 2012)
- Calibration Run preparation
- Calibration Schedules
- Calibration topics by dataset
- Docs
- STAR Automated Calibration Project
- SVT Calibrations
- TPC Calibrations
- BeamLine Constraint
- Databases
- Quality Assurance
- Calibration
- Grid and Cloud
- Infrastructure
- Machine Learning
- Offline Software
- Production
- S&C internal group meetings
- Test tree
Run 15 pp200
Updated on Mon, 2015-05-11 16:12. Originally created by genevb on 2015-05-08 10:36.
Under:
Preliminary calibration (no tilt, from HFT):
Run 15 pp200 preliminary 2
Final calibration?
- Xin Dong determined the position of the beam spot at z=0 with respect to the center of the PXL (see the "all triggers" result of this page: Run15 pp 200 GeV beam position check)
- Transforming this to global coordinates results in (x0,y0) = (0.01,-0.24)
Run 15 pp200 preliminary 2
Final calibration?
»
- Printer-friendly version
- Login or register to post comments