Run 15 pp200

Under:
Preliminary calibration (no tilt, from HFT):
  • Xin Dong determined the position of the beam spot at z=0 with respect to the center of the PXL (see the "all triggers" result of this page: Run15 pp 200 GeV beam position check)
  • Transforming this to global coordinates results in (x0,y0) = (0.01,-0.24)

Run 15 pp200 preliminary 2

Final calibration?