- BEMC
- BEMC Detector Operator Manual
- Calibrations
- BPRS
- BSMD
- 1) DATA: 2008 BSMD Calibration
- 1) M-C : response of BSMD , single particles (Jan)
- BSMD 2005 energy scale uncertainty
- Definition of absolute BSMD calibration
- Mapping, strip to tower distance
- Run 10 BSMD Calibrations
- Run 9 BSMD Calibration
- 01 Status of BSMDE,P at the end of pp 500 GeV run, April of 2009
- 02 offline QA of BSMD pp 500, ver1 (Willie+Jan)
- 03 correlated, small ADC spikes in BSMD (Jan)
- 2009 BSMD Relative Gains Information
- DELETE - Run 9 BSMD Status Update 3 (4/24)
- DELETE - Run 9 BSMD Status Update 4 (4/27)
- DELETE - Run 9 BSMD Status Update 5 (4/30)
- DELETE - Run 9 BSMD Status Update 6 (5/4)
- Final Run 9 200 GeV BSMD Status
- Final Run 9 500 GeV BSMD Status - Willie Leight
- Final Run 9 BSMD Absolute Calibration
- Run 9 BSMD Status Update 1 (4/19)
- details about known hardware problems
- details of SMD simulator, simu shower zoom-in
- one cluster topology , definition of 'barrel cell'
- BTOW - Calibration Procedure
- Run 12 BTOW Calibration
- Run 3 BTOW Calibration
- Run 4 BTOW Calibration
- Run 5 BTOW Calibration
- Run 6 BTOW Calibration
- Run 7 BTOW Calibration
- Run 8 BTOW Calibration (2008)
- Run 9 BTOW Calibration
- Database
- Hardware
- Mapping
- Service Tasks
- Software
- Useful Documents
- EEMC
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HLT
- L3
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
DELETE - Run 9 BSMD Status Update 6 (5/4)
Updated on Thu, 2009-05-14 04:30. Originally created by wleight on 2009-05-04 14:22.
Under:
As Matt says that the maximum status is 255, I have dropped the old status bit 5 as (it was unused). Also, I have loosened the dead strip cuts based on looking at module 55 (see pages 203 or 205 in the attached crate1.pdf, for instance). The status bits are now as follows:
Bit 2: Bad pedestal peak/multiple pedestal peaks.
Bit 3: Pedestal peak has bad sigma, sigma<1 or sigma >15
Bit 4: Chi squared value from gaussian fit is greater than 1000 (this applies only for strips that do not have bad status 2 already)
Bit 5: The ratio of the integral of channels 300-500 to the total integral does not fall between .0005 and .02
Bit 6: The ratio of the integral of channels 500-800 to the total integral does not fall between .0002 and .02
Bit 7: The ratio of the integral of channels greater than 800 to the total integral does not fall between .0002 and .02
Below is a plot of status vs. eta and phi for BSMDE and BSMDP strips. Note that strips with all three of bits 5, 6, 7 bad (generally, dead strips) are given the value 8 in this plot to distinguish them from strips that may have just one of those bits bad. As some strips may have more than one bad status bit, for clarity I ranked the potential bad statuses in the order 2, 8, 7, 6, 5, 4, 3 (i.e., approximately in order of importance) and plotted for each strip only the highest-ranked status.
Additionally, I found a problem I had not seen before. On page 207 of the attached crate1.pdf you can see that in the L2W data some strips have a large peak out in the tail of the ADC distribution. However, as all these strips are caught by my code it's not a serious problem.
»
- Printer-friendly version
- Login or register to post comments