- BEMC
- BTOF
- DAQ
- Detector Upgrades
- EEMC
- EPD
- 2017 cosmic ray tests at OSU and BNL
- Calibrations
- EPD Meetings
- EPD Slow-Control Manual
- EPD-GSTAR
- IV Scan
- Individual's pages
- Known issues and problems
- Mapping
- Offline DataBase
- Operations 2017
- Operations 2018
- Operations 2019
- Operations 2024
- Software
- Start-of-run EPD tasks and instructions
- Useful EPD documents
- Useful Links
- ETOF
- FCS
- FGT
- FPD & FMS & FPS
- FTPC
- FTT
- HFT
- HLT
- L3
- MTD
- MTD NPS Maps
- PMD
- PP2PP
- RICH
- Roman Pot Phase II*
- Run-18 calibrations
- SSD
- SVT
- Slow Controls
- TPC
- TRG
- Trigger Detectors
- VPD
- test
Hardware documents
Updated on Sun, 2021-05-09 14:54 by iupsal. Originally created by lisa on 2017-03-21 22:57.
Under:
This page is to organize hardware-related documents and pages.
At the bottom of this page are "child pages" related to
Always useful: a very explicit set of pictures showing the mapping between WLS fiber ends and the tile number is at drupal.star.bnl.gov/STAR/system/files/TileFiberMapping_0.pdf
Here is the logbook used for Supersector testing at Ohio State 30 June - 16 Oct 2017
Here is the supersector construction logbook from OSU in summer 2017 - PLEASE BE CAREFUL! I don't seem to be able to make this read-only. You should put the setting (upper right) to "viewing" to protect against unintended changes.
Key logbooks
Logbook | links |
---|---|
OSU Supersector Construction Logbook (2017) | online google doc (do not edit!) / pdf file (printout of google doc) / .docx file |
EPD BNL Logbook (2016-2018) | 01-40, 42-49, 51-96, 97-123 |
OSU Supersector Testing Logbook (2017) | 01-49, 50-99, 100-149, 150-159, 160, 161-174 |
At the bottom of this page are "child pages" related to
- complete bench tests of supersectors done at Ohio State University and Brookhaven Lab
- complete bench tests of fiber bundles done at Lehigh University
- complete bench tests of FEEs, SiPMs, and Rx cards done at University of Science and Technology of China (USTC)
Always useful: a very explicit set of pictures showing the mapping between WLS fiber ends and the tile number is at drupal.star.bnl.gov/STAR/system/files/TileFiberMapping_0.pdf
Here is the logbook used for Supersector testing at Ohio State 30 June - 16 Oct 2017
- pages 1-49: drupal.star.bnl.gov/STAR/system/files/EPD%20SS%20testing%20pp%201-49_0.pdf
- pages 50-99: drupal.star.bnl.gov/STAR/system/files/EPD%20SS%20testing%20pp%2050-99_0.pdf
- pages 100-149: drupal.star.bnl.gov/STAR/system/files/EPD%20SS%20testing%20pp%20100-149_0.pdf
- pages 150-159: drupal.star.bnl.gov/STAR/system/files/EPD%20SS%20testing%20pp%20150-160.pdf
- page 160: drupal.star.bnl.gov/STAR/system/files/EPD%20SS%20testing%20-%20page%20160.pdf
- pages 161-174: drupal.star.bnl.gov/STAR/system/files/EPD%20SS%20testing%20pp%20161-174.pdf
Here is the supersector construction logbook from OSU in summer 2017 - PLEASE BE CAREFUL! I don't seem to be able to make this read-only. You should put the setting (upper right) to "viewing" to protect against unintended changes.
- Just to be safe, here is a pdf printout of that logbook: drupal.star.bnl.gov/STAR/system/files/OsuSupersectorConstructionLogbook.pdf
»
- Printer-friendly version
- Login or register to post comments