Software and Computing
Software and Computing phone meeting
1-189, HighSpeed conference bridge, at 17:00 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
12:00 | Summary of the plan for h+/h- in d+Au ( 00:10 ) 0 files | Jerome Lauret (BNL) |
12:10 | D0 simulation production, d+Au test sample ( 00:10 ) 0 files | Lidia Didenko (BNL) |
12:20 | RICH scalers ( 00:20 ) 1 file | Christopher Powell (LBNL) |
12:40 | Status updates ( 00:15 ) 0 files | All (BNL) |
12:55 | AOB ( 00:05 ) 0 files | All (All) |
STAR Grid Activities
1-189 and phone conference, at 18:00 (GMT), duration : 01:00
Site reports: -BNL -PDSF -WSU EC2 / Virtualization status KISTI/networking news -Network reshape status OSG News and meeting reports Phone / bridge information: In the US, call 1-605-475-8500 Enter Conference Room Number : 5343115 Skype +99008275343115 -Wayne Betts
HOW-TO: compile RunLogDb daemon
- Login to root@onldb.starp.bnl.gov
- Copy latest "/online/production/database/Run_[N]/" directory contents to "/online/production/database/Run_[N+1]/"
- Grep eve
STAR Electronic Shiftlog (ESL) Administrator Manual
STAR Electronic Shiftlog (ESL) Administration guide
The STAR (ESL) Electronic Shiftlog is written in JSP (Java server pages) and requires a web server that can render JSP content.
Server list and various parameters
Here will be a server list (only those servers participating in various replication scenarios)
FUSE & SSHFS - Overview and example in STAR online environment
FUSE (Filesystem in Userspace)
Fixing Slave Replication In A STAR Offline Database Mirror
Mike's trick for fixing an offline database slave when it won't sync with the master is to be carried out as follows:
cd /var/run/mysqld
ls -lh | grep "mysqld-relay-bin"
2008 TOF Software review
2-78 / 510, at 05:00 (GMT), duration : 18:00
The review will take place on November the 10th and will be held in room 2-78 in Building 510 (Physics). For EVO booking - click here (short summary follows, EVO booking information (ICS, TXT)):
Title: TOF Software review Description: 2008 review of the STAR/TOF sub-system project. Community: STAR Eastern Standard Time (-0500) Start 2008-11-10 09:00 End 2008-11-10 18:00
Time | Talk | Presenter |
---|---|---|
09:00 | Closed session ( 00:10 ) 0 files | Review commitee (All) |
09:10 | Introduction & TOF Event Structure ( 00:50 ) 1 file | Xin Dong (LBNL) |
10:00 | Online monitoring and Offline Reader ( 00:30 ) 1 file | Jing Liu (Rice) |
10:30 | Break ( 00:15 ) 0 files | --- |
10:45 | Offline QA and calibration production chain ( 00:30 ) 0 files | Xin Dong (LBNL) |
11:15 | Offline calibration ( 01:00 ) 2 files | Jing Liu / Zebo Tang (Rice / USTC) |
12:15 | Lunch ( 01:45 ) 0 files | --- |
14:00 | Physics production chain ( 00:30 ) 0 files | Xin Dong (LBNL) |
14:30 | TOF Geometry ( 00:30 ) 1 file | Bill Llope (Rice) |
15:00 | Simulation/embedding chain ( 00:30 ) 1 file | Dylan Thein (UTA) |
15:30 | Break ( 00:15 ) 0 files | --- |
15:45 | PID strategy ( 00:20 ) 1 file | Masayuki Wada (UTA) |
16:05 | DB tables ( 00:30 ) 0 files | Xin Dong (LBNL) |
16:35 | Offline analysis tools ( 00:20 ) 0 files | Xin Dong (LBNL) |
16:55 | VPD vertexing ( 00:20 ) 1 file | Xiaoping Zhang (LBNL) |
17:15 | Q&A ( 00:15 ) 0 files | --- |
17:30 | Closed Committe Meeting ( 00:30 ) 0 files | --- |
2008 - EMC calibration workshop
The EMC calibration workshop was launched as with a start up Email to starmail on 9/4/2008 10:31. A copy resides below. The review report was requested to be delivered by October the 29th 2008.
2008 - TOF software review
The Time Of Flight sub-system was called for a software readiness and integration review in the Fall of 2008. The commitee's charges are available below in the related documents section.
Recommended settings for key nodes
The following set of recommendations applies to mission critical systems in use in STAR.
TPC Pt and DCA resolution
[Update on 2010-06-21: global track momentum resolution has now also been studied using Cosmic rays study, version 2, with some as yet unexplained good performance at very high pT
2008 documents
This page will have security related documents and policy previews.
The current list is:
Software and Computing phone meeting
1-189, HighSpeed conference bridge, at 16:00 (GMT), duration : 01:00
Time | Talk | Presenter |
---|---|---|
12:00 | Overview of simulation opened requests ( 00:15 ) 0 files | Victor Perevoztchikov (BNL) |
12:15 | SSD opened issues ( 00:20 ) 1 file | Jonathan Bouchet (KSU) |
12:35 | Database synchronization, problem, path forward ( 00:15 ) 1 file | Micheal DePhillips (BNL) |
12:50 | Summary of production readiness ( 00:10 ) 0 files | All (All) |