devika's blog - Reading W events in different eta bins: - June 9., 2014
- RHIC-AGS user Meeting - June 11., 2014
- Run 13 BEMC Calibration - Summary Report [STAR run 2013 pp510 GeV BEMC Calibration] - March 29., 2016
- Run 13 BEMC Calibration : Avg E/P in momentum slices - October 8., 2015
- Run 13 BEMC Calibration : BTOW Tower Energy distributions - October 6., 2015
- Run 13 BEMC Calibration : EMC2 presentation-9/15/2015 [Trigger Options] - September 15., 2015
- Run 13 BEMC Calibration : Events counts of various trigger options - September 26., 2015
- Run 13 BEMC Calibration : PID_Cuts (nSigmaPion and nSigmaElectron) study - August 27., 2015
- Run 13 BEMC Calibration : Relative Calibration [MIP analysis] - February 24., 2015
- Run 13 BEMC Calibration : Spin PWG presentation-01/18/2016 - January 19., 2016
- Run 13 BEMC Calibration : Study of TOF Cuts - October 13., 2015
- Run 13 BEMC Calibration : Trigger bias discussion [during the STAR collaboration meeting January2016] - January 26., 2016
- Run 13 BEMC Calibration : Why very forward two eta rings have systematically low E/P - August 30., 2015
- Run 13 BEMC Calibration: Study on nHits cut - October 8., 2015
- Run 13 TPC Calibration - January 21., 2015
- Run 13 W Analysis : Preliminary Results - September 9., 2016
- Run 13 W Analysis : Release of W AL Preliminary Results at INPC 2016 and SPIN 2016 conferences - WorkPlan - April 28., 2016
- Run 13 W analysis : Cut Optimization - November 18., 2014
- Run 13 W Analysis : Final Results : BG Estimation using New (SL16g) embedding - August 22., 2017
- Run 13 W Analysis : Final Results : Embedding QA - June 28., 2017
- Run 13 W Analysis : Final Results : Paper : W Meeting Discussions/ Presentations - June 28., 2017
- Run 13 W Analysis : Final Results : Theory Curves - October 2., 2017
- Run 13 W analysis : Manual run QA for run 13 data - June 5., 2013
- Run 13 W analysis : Official St_WB stream production, P16ig QA - September 8., 2016
- Run 13 W analysis : Production Details - April 2., 2016
|